Skip to content
Substrata
Join

Process · US GB FR CN KR

SMR first-of-a-kind licensing

Permission to build the first small nuclear reactor of a new design. The physics is known; the licence is the wait.

Searching is free and needs no AI. Summaries use your own AI model.

Severity
How this is computedSum of four judged scores, each 0–3: concentration + substitution + lead time + inelasticity.Method →Code →
How hard it binds, 0 to 12
When it bites
Later
judged 2026-09-15
Evidence
Unverified
1 maker rows

01Why it holds things up

Small modular reactors are a permission and first-of-a-kind construction problem. The physics is older than the licence.

Part of the process · Permission, which takes years to a decade to loosen once somebody decides to.

02Severity

judged 2026-09-15 · a judgement, not a measurement

How this is computedSum of four judged scores, each 0–3: concentration + substitution + lead time + inelasticity.Method →Code → / 12

How few suppliers qualify
Estimate, not a measurementRelief is a licence and a first plant, not a factory for reactors. Measured in a decade.By Substrata, open to challenge · 2026-09-15 / 3
How hard to replace
Estimate, not a measurementRelief is a licence and a first plant, not a factory for reactors. Measured in a decade.By Substrata, open to challenge · 2026-09-15 / 3
Decision to new capacity
Estimate, not a measurementRelief is a licence and a first plant, not a factory for reactors. Measured in a decade.By Substrata, open to challenge · 2026-09-15 / 3
Can the buyer walk away
Estimate, not a measurementRelief is a licence and a first plant, not a factory for reactors. Measured in a decade.By Substrata, open to challenge · 2026-09-15 / 3

Relief is a licence and a first plant, not a factory for reactors. Measured in a decade.

03Rules that govern it

No rule has been researched for this one yet.

Policy coverage is being built jurisdiction by jurisdiction.

04What would remove it

No candidate relief has been written up for this one yet.

05Science pipeline

114 papers, preprints and grants collected, unreviewed
  1. Research91 (Computed: Items per stage = papers, preprints and grants collected for the bottleneck whose relevance score is 2 or more, placed on a stage by the rule in lib/science.ts; judgements are counted separately.)+11 (Computed: Items first collected in the last 7 days whose publication or award date is within the last 30 days.) new
  2. Lab21 (Computed: Items per stage = papers, preprints and grants collected for the bottleneck whose relevance score is 2 or more, placed on a stage by the rule in lib/science.ts; judgements are counted separately.)
  3. Pilot2 (Computed: Items per stage = papers, preprints and grants collected for the bottleneck whose relevance score is 2 or more, placed on a stage by the rule in lib/science.ts; judgements are counted separately.)
  4. Early0 (Computed: Items per stage = papers, preprints and grants collected for the bottleneck whose relevance score is 2 or more, placed on a stage by the rule in lib/science.ts; judgements are counted separately.)
  5. Scale0 (Computed: Items per stage = papers, preprints and grants collected for the bottleneck whose relevance score is 2 or more, placed on a stage by the rule in lib/science.ts; judgements are counted separately.)

judged, with a citation claimed, no citationNumber: papers, preprints and grants the feeds collected — unreviewed

The full pipeline, by stage →

06What has happened

Nothing recorded about this one yet.

Events are added when a source is read and accepted by hand.

Discussion

Comments use threadkit (permission is participation). Sign in with OrangeCat to write. Fact-check is the same assistant as Ask, grounded in the corpus.

  • No comments yet.

Need an account? Sign in.