What if it fails?

Pick a scenario on the record, or build your own from a company (private ones included), a bottleneck or a country. You get what it hits, what lies downstream, which listed companies are exposed, and what the record says about recovery — one recorded step at a time (rule).

Large power transformer slots goes offline

Step one · How this is computedDirect hits: bottlenecks where the failed node is a maker, a part supplier or the location. Makers wholly inside it are lost; makers also operating elsewhere are partly affected; the rest remain. Downstream: every bottleneck that needs a hit one, transitively, through recorded rows. Exposed: holders of hit and downstream bottlenecks and companies a filing says need or sell into them.Method →Code → bottleneck hit directly

BottleneckResultMakers lostPartly in itMakers remainingParts lost
Large power transformer slotsTaken out directlyHitachi Energy, Mitsubishi Electricnone nonenone

Step two · How this is computedDirect hits: bottlenecks where the failed node is a maker, a part supplier or the location. Makers wholly inside it are lost; makers also operating elsewhere are partly affected; the rest remain. Downstream: every bottleneck that needs a hit one, transitively, through recorded rows. Exposed: holders of hit and downstream bottlenecks and companies a filing says need or sell into them.Method →Code → downstream through recorded inputs

No recorded dependency leads downstream from these. That can mean nothing depends on them, or that the dependency has not been sourced yet.

Step three · How this is computedDirect hits: bottlenecks where the failed node is a maker, a part supplier or the location. Makers wholly inside it are lost; makers also operating elsewhere are partly affected; the rest remain. Downstream: every bottleneck that needs a hit one, transitively, through recorded rows. Exposed: holders of hit and downstream bottlenecks and companies a filing says need or sell into them.Method →Code → companies exposed, How this is computedOrganisations recorded on a bottleneck (maker, capacity holder or part supplier) whose shares, or a parent’s, trade on an exchange found in the SEC ticker file or OpenFIGI.Method →Code → with a listing

Exposure is a recorded relation, not a size, and not a direction: a remaining maker may gain as much as a dependent loses.

CompanyListingHow it is exposed
Hitachi Energy6501 JPvia HitachiMaker lost · Large power transformer slots
Mitsubishi Electric6503 JPMaker lost · Large power transformer slots
AnthropicPrivateNeeds it (sourced) · Large power transformer slots source

Step four · what the record says about recovery

No recovery date is computed: the corpus holds no measured lead-time series. What it holds is shown with its basis.

  • Large power transformer slots
    Lead-time test
    Estimate, not a measurementLead times past two years and no datacentre without one. One of the gates on announced compute, alongside chips.By Substrata, open to challenge · 2026-09-15 — decision to new capacity, a judged score in the assessment
    Relief time at this stage
    Estimate, not a measurementOrder-of-magnitude time from a decision to relief at this stage of the loop. Illustrative: chosen by hand, not taken from a measured lead-time dataset.By Substrata, open to challenge · 2026-09-15 (Energy, order of magnitude)
Try another scenario

On the record

Or build your own