Backlog · company: GE Vernova · USD m

Power segment equipment remaining performance obligation

How this is computedThe latest value in a series minus the value before it, divided by the earlier value, same series and unit.24,707 (31 Dec 2025) → 39,261 (30 Jun 2026).Method →Code → vs 31 Dec 2025 · tightens
Power segment equipment remaining performance obligation, USD m, 31 Dec 2022 to 30 Jun 2026. Every value is listed in the table below.
PeriodValueSource
30 Jun 2026SourcedGE Vernova (Q2 2026 Form 10-Q) · 2026-07-22Open the source → USD mGE Vernova (Q2 2026 Form 10-Q) ↗ primaryRPO June 30, 2026 December 31, 2025 June 30, 2025 Equipment $ 39,261 $ 24,707 $ 16,133Power segment (Gas Power, Nuclear, Hydro, Steam) equipment RPO, $ millions; verbatim table text. Excludes slot reservation agreements.
31 Dec 2025SourcedGE Vernova (2025 Form 10-K) · 2026-01-29Open the source → USD mGE Vernova (2025 Form 10-K) ↗ primaryGas Turbine Gigawatts 15.3 11.9 13.8 RPO December 31 2025 2024 2023 Equipment $ 24,707 $ 12,461 $ 13,636Power segment (Gas Power, Nuclear, Hydro, Steam) equipment RPO, $ millions; verbatim table text. Excludes slot reservation agreements.
31 Dec 2024SourcedGE Vernova (2025 Form 10-K) · 2026-01-29Open the source → USD mGE Vernova (2025 Form 10-K) ↗ primaryGas Turbine Gigawatts 15.3 11.9 13.8 RPO December 31 2025 2024 2023 Equipment $ 24,707 $ 12,461 $ 13,636Power segment (Gas Power, Nuclear, Hydro, Steam) equipment RPO, $ millions; verbatim table text. Excludes slot reservation agreements.
31 Dec 2023SourcedGE Vernova (2025 Form 10-K) · 2026-01-29Open the source → USD mGE Vernova (2025 Form 10-K) ↗ primaryGas Turbine Gigawatts 15.3 11.9 13.8 RPO December 31 2025 2024 2023 Equipment $ 24,707 $ 12,461 $ 13,636Power segment (Gas Power, Nuclear, Hydro, Steam) equipment RPO, $ millions; verbatim table text. Excludes slot reservation agreements.
31 Dec 2022SourcedGE Vernova (2024 Form 10-K) · 2025-02-06Open the source → USD mGE Vernova (2024 Form 10-K) ↗ primaryGas Turbine Gigawatts 11.9 13.8 11.1 RPO December 31 2024 2023 2022 Equipment $ 12,461 $ 13,636 $ 13,579Power segment (Gas Power, Nuclear, Hydro, Steam) equipment RPO, $ millions; verbatim table text. Excludes slot reservation agreements.

Read from the sources Read from the source by an agent; quote matched mechanically against the fetched page; not yet reviewed by a person, 2026-09-24. Each value links the page it came from and quotes the sentence that carries it.