Skip to content
Substrata
DeskJoin

North Africa · DZ

Algeria

5.8% of world helium (production, 2025).

  • extraction

Shares and ranks computed from USGS, EIA and WNA tables; rules from the policy register; measures from the OECD inventory. On the map →

Algeria at a glance
FigureValueNote
In world helium4th5.8% of world output, 2025
Companies here0none recorded yet
Rules it sets0policy instruments on record
Events0none accepted yet

01What it produces

5 tables, USGS, EIA and WNA
Share of world output on the country’s leading production series for each resource, each bar drawn against the whole world, computed from the USGS, EIA and WNA tables; the rank beside each name is among countries the table lists individually.
Share of world output on the country’s leading production series for each resource, each bar drawn against the whole world, computed from the USGS, EIA and WNA tables; the rank beside each name is among countries the table lists individually.
RowValue (% of world)ShareNote
Helium · 4th5.84th in the world, production, 2025
Natural gas · 10th2.310th in the world, production, 2024

Also produces, small shares: oil 1.4% · 17th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), phosphates 0.8% · 16th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), hydropower <0.1% · 143rd (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.).

02What this holds up

2 loops
  • Energyone turn: Months to years

    endowed with Liquid helium (He-4), which gates it.

    Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15 · this join is directory join, not a sourced finding

  • endowed with Liquid helium (He-4), which gates it.

    Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15 · this join is directory join, not a sourced finding

A loop is one design, build and measure turn. Severity is a dated judgement on a 0–12 scale, not a measurement, and the judgements are not added together — the figure shown is the worst single one.

03What we know, and what is missing

1 full · 2 thin · 4 empty, counted from stated rows
  • Endowment and output

    6 resources measured in USGS, EIA or WNA tables; 1 endowment row.

    Full
  • Facilities

    3 rows in the USGS Minerals Yearbook chapter (2019). Full needs at least 10 stated facility rows.

    Thin
  • Companies

    3 operators named by USGS; 0 directory companies. Full needs at least 5 stated named operators.

    Thin
  • Law and licensing

    0 instruments it issues (0 on licensing); 0 OECD export measures. Full needs at least 3 stated rules on record, including how it licenses extraction or processing (a licence regime, permit or procedure).

    Empty
  • Trade

    no source in the repository yet. Full needs at least 3 stated named counterparties.

    Empty
  • Events

    0 accepted events in its jurisdiction. Full needs at least 5 stated dated events.

    Empty
  • People and labs

    0 labs in the register. Full needs at least 3 stated labs or people.

    Empty

Only stated rows count; candidate rows and rows worked out by a rule are shown elsewhere and never fill a box. How each box is computed · Send a source for an empty box →

04How complete is this picture

1 of 3 computed · named capacity / national production, stated rows only

For each resource: the capacity of facilities with a named operator, over the national production figure. Open a row for the working. Capacity is what the named plants can produce, not what they produced: plants run below capacity, so this can pass 100% and is not a share of output. No source here states production per facility, so "named operators made X% of output" is not claimed.

  • Heliumnamed capacity covers the national figure (capacity can exceed output) · heliumCheck the row: one printed figure dominates — GL1K and GNL2K complexes, Skikda Province≥100%

    42 million m³ named ÷ 11 million m³ national = 381.8% (exact). All rows of this basis, named or not: 42 million m³ (2 rows). The facility table is for 2019 and the national figure for 2024: 5 years apart.

    Check the row: one printed figure dominates — GL1K and GNL2K complexes, Skikda Province (Helison Production S.p.A.) prints 25 million cubic meters under "Helium", 60% of the named capacity. This is a question about the source table; the figure is shown as printed.

    National figure: USGS, World Production and Reserves ↗ — Production, 2024: “11” (Data in million cubic meters, estimated).

    Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table 2) ↗. 2 of 2 rows name an operator; 2 of 2 named operators have a stated owner. Flows: no stated ships_to flow of helium from this country is held yet.

    • GL1Z and GL3Z complexes, Arzew, Oran Province — Helium; 17 million cubic meters. counted as named.

      Operator: Helios S.p.A.

    • GL1K and GNL2K complexes, Skikda Province — Helium; 25 million cubic meters. counted as named.

      Operator: Helison Production S.p.A.

  • CopperCannot be computed: no row measures what the national figure measures (copper content, mined): the row does not say whether it counts metal content or gross tonnagen/a

    Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 1 rows name an operator; 0 of 1 named operators have a stated owner. Flows: no stated ships_to flow of copper from this country is held yet.

    • Plant at Ghazaouet, Tlemcen Province — Copper, cathode; 30000 metric tons. not compared: the row does not say whether it counts metal content or gross tonnage.

      Operator: Société Algérienne du Zinc S.p.A.

  • PhosphatesCannot be computed: the 2019 facility table lists no phosphates facilityn/a

    Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 0 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of phosphates from this country is held yet.

Derived and lead relations are never counted here. How the ratio is computed

Discussion

Comments use threadkit (permission is participation). Sign in with OrangeCat to write. Fact-check is the same assistant as Ask, grounded in the corpus.

Loading comments…