Northern Europe · NO
Norway
3.1% of world natural gas (production, 2024); 1 company in the corpus.
- extraction
- research
Shares and ranks computed from USGS, EIA and WNA tables; rules from the policy register; measures from the OECD inventory. On the map →
- 8thIn world natural gas3.1% of world output, 2024
- 1Companies herein the corpus, graded
- 0Rules it setspolicy instruments on record
- 1Eventsnewest 2026-06-30
| Figure | Value | Note |
|---|---|---|
| In world natural gas | 8th | 3.1% of world output, 2024 |
| Companies here | 1 | in the corpus, graded |
| Rules it sets | 0 | policy instruments on record |
| Events | 1 | newest 2026-06-30 |
01What it produces
Also named in the directory, with no production table listing this country: Nickel.
Also produces, small shares: oil 2.2% · 12th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), graphite 0.4% · 10th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), coal <0.1% · 59th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.).
02Companies here
- The Quartz Corp
Extraction · High-purity quartz sand
Chokepoint
The grade is the directory’s judgement of how replaceable the company is at its step of the chain, not a market share. Companies are those the corpus records, not every firm in the country.
03What has happened
- 2026-06-30NeutralFilingUS NO
The Quartz Corp restructures its US operations, citing persistent losses in its renewable-energy business.
Crucible-grade high-purity quartz sand
thequartzcorp.com ↗official source
The sentence that says so
“The renewable energy industry, a significant business area for The Quartz Corp (TQC), is affected internationally by persistent losses.”
04What we know, and what is missing
- Endowment and output
6 resources measured in USGS, EIA or WNA tables; the directory also names nickel, which no table measures. Full needs at least 1 stated measured resource.
Thin - Facilities
17 rows in the USGS Minerals Yearbook chapter (2019).
Full - Companies
15 operators named by USGS; 1 directory companies.
Full - Law and licensing
0 instruments it issues (0 on licensing); 0 OECD export measures. Full needs at least 3 stated rules on record, including how it licenses extraction or processing (a licence regime, permit or procedure).
Empty - Trade
no source in the repository yet. Full needs at least 3 stated named counterparties.
Empty - Events
1 accepted events in its jurisdiction. Full needs at least 5 stated dated events.
Thin - People and labs
0 labs in the register. Full needs at least 3 stated labs or people.
Empty
Only stated rows count; candidate rows and rows worked out by a rule are shown elsewhere and never fill a box. How each box is computed · Send a source for an empty box →
05How complete is this picture
For each resource: the capacity of facilities with a named operator, over the national production figure. Open a row for the working. Capacity is what the named plants can produce, not what they produced: plants run below capacity, so this can pass 100% and is not a share of output. No source here states production per facility, so "named operators made X% of output" is not claimed.
Bauxite / aluminiumCannot be computed: no row measures what the national figure measures (bauxite, mined): printed as "aluminum", not bauxite, mined
Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table 2) ↗. 3 of 3 rows name an operator; 1 of 2 named operators have a stated owner. Flows: no stated ships_to flow of bauxite from this country is held yet.
Smelters at Lista and Mosjoen — Aluminum; 282 thousand metric tons. not compared: printed as "aluminum", not bauxite, mined.
Operator: Alcoa Inc.
Smelters at Ardal, Husnes, Hoyanger, Karmoy, and Sunndal — Aluminum; 1032 thousand metric tons. not compared: printed as "aluminum", not bauxite, mined.
Operator: Hydro Aluminium AS
Rolling mill at Holmestrand — Aluminum; 90 thousand metric tons. not compared: printed as "aluminum", not bauxite, mined.
Operator: Hydro Aluminium AS
CobaltCannot be computed: no row measures what the national figure measures (cobalt content, mined): the row does not say whether it counts metal content or gross tonnage
Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 1 rows name an operator; 1 of 1 named operators have a stated owner. Flows: no stated ships_to flow of cobalt from this country is held yet.
Refinery at Kristiansand — Cobalt; 5 thousand metric tons. not compared: the row does not say whether it counts metal content or gross tonnage.
Operator: Nikkelverk AS
CopperCannot be computed: no row measures what the national figure measures (copper content, mined): the row does not say whether it counts metal content or gross tonnage
Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 1 rows name an operator; 1 of 1 named operators have a stated owner. Flows: no stated ships_to flow of copper from this country is held yet.
Refinery at Kristiansand — Copper, metal; 40 thousand metric tons. not compared: the row does not say whether it counts metal content or gross tonnage.
Operator: Nikkelverk AS
GraphiteCannot be computed: no national series is matched to facility rows for graphite yet
Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 1 rows name an operator; 1 of 1 named operators have a stated owner. Flows: no stated ships_to flow of graphite from this country is held yet.
Iron oreCannot be computed: no row measures what the national figure measures (usable iron ore, gross weight): printed as "iron ore, mine", not usable iron ore, gross weight
Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 2 rows name an operator; 0 of 1 named operators have a stated owner. Flows: no stated ships_to flow of iron from this country is held yet.
Mine at Mo i Rana — Iron ore, mine; NA thousand metric tons. not compared: printed as "iron ore, mine", not usable iron ore, gross weight.
Operator: Rana Gruber AS
Mine at Bjornevatn2 — Iron ore, mine; NA thousand metric tons. not compared: printed as "iron ore, mine", not usable iron ore, gross weight.
No stated operator
NickelCannot be computed: no row measures what the national figure measures (nickel content, mined): the row does not say whether it counts metal content or gross tonnage
Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 1 rows name an operator; 1 of 1 named operators have a stated owner. Flows: no stated ships_to flow of nickel from this country is held yet.
Mine at Tellnes — Ore, concentrate,; 350 metric tons. not compared: the row does not say whether it counts metal content or gross tonnage.
Operator: Titania AS
Silicon metalCannot be computed: no national series is matched to facility rows for silicon metal yet
Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table 2) ↗. 3 of 8 rows name an operator; 0 of 3 named operators have a stated owner. Flows: no stated ships_to flow of silicon from this country is held yet.
Derived and lead relations are never counted here. How the ratio is computed
Discussion
Comments use threadkit (permission is participation). Sign in with OrangeCat to write. Fact-check is the same assistant as Ask, grounded in the corpus.
Loading comments…