West Asia · QA
Qatar
33% of world helium (production, 2025); 1 company in the corpus.
- energy
- capital
- extraction
- research
Shares and ranks computed from USGS, EIA and WNA tables; rules from the policy register; measures from the OECD inventory. On the map →
- 2ndIn world heliumtop three in 1 of 3 resources listed
- 1Companies herein the corpus, graded
- 0Rules it setspolicy instruments on record
- 1Eventsnewest 2026-03-18
| Figure | Value | Note |
|---|---|---|
| In world helium | 2nd | top three in 1 of 3 resources listed |
| Companies here | 1 | in the corpus, graded |
| Rules it sets | 0 | policy instruments on record |
| Events | 1 | newest 2026-03-18 |
01What it produces
Also produces, small shares: oil 1.5% · 16th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.).
02Companies here
- QatarEnergy
Extraction · Helium from LNG
Concentrated
The grade is the directory’s judgement of how replaceable the company is at its step of the chain, not a market share. Companies are those the corpus records, not every firm in the country.
03What has happened
- 2026-03-18TightensOutageQA IR
The war that began in Iran in February triggers a helium shortage that could slow chip production.
dw.com ↗secondary source
The sentence that says so
“Among the latest geopolitical uncertainties for the industry is a shortage of helium that could slow global production.”
04What this holds up
- Energyone turn: Months to years
endowed with Liquid helium (He-4), which gates it.
Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15 · this join is directory join, not a sourced finding
- Materials qualificationone turn: Years
endowed with Liquid helium (He-4), which gates it.
Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15 · this join is directory join, not a sourced finding
A loop is one design, build and measure turn. Severity is a dated judgement on a 0–12 scale, not a measurement, and the judgements are not added together — the figure shown is the worst single one.
05What we know, and what is missing
- Endowment and output
3 resources measured in USGS, EIA or WNA tables; 1 endowment row.
Full - Facilities
2 rows in the USGS Minerals Yearbook chapter (2020-21). Full needs at least 10 stated facility rows.
Thin - Companies
2 operators named by USGS; 1 directory companies. Full needs at least 5 stated named operators.
Thin - Law and licensing
0 instruments it issues (0 on licensing); 0 OECD export measures. Full needs at least 3 stated rules on record, including how it licenses extraction or processing (a licence regime, permit or procedure).
Empty - Trade
no source in the repository yet. Full needs at least 3 stated named counterparties.
Empty - Events
1 accepted events in its jurisdiction. Full needs at least 5 stated dated events.
Thin - People and labs
0 labs in the register. Full needs at least 3 stated labs or people.
Empty
Only stated rows count; candidate rows and rows worked out by a rule are shown elsewhere and never fill a box. How each box is computed · Send a source for an empty box →
06How complete is this picture
For each resource: the capacity of facilities with a named operator, over the national production figure. Open a row for the working. Capacity is what the named plants can produce, not what they produced: plants run below capacity, so this can pass 100% and is not a share of output. No source here states production per facility, so "named operators made X% of output" is not claimed.
Heliumnamed capacity / national production · helium
0 million m³ named ÷ 64 million m³ national = 0.0% (exact). All rows of this basis, named or not: 74 million m³ (1 row). The facility table is for 2020-21 and the national figure for 2024: 3 years apart.
National figure: USGS, World Production and Reserves ↗ — Production, 2024: “64” (Data in million cubic meters, estimated).
Facilities: USGS Minerals Yearbook 2020-21, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 1 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of helium from this country is held yet.
Qatar Helium plants 1, 2, and 3, Ras Laffan, 80 kilometers north of Doha — Helium; 74 million cubic meters. listed, not named.
No stated operator
Bauxite / aluminiumCannot be computed: no row measures what the national figure measures (bauxite, mined): printed as "aluminum", not bauxite, mined
Facilities: USGS Minerals Yearbook 2020-21, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 1 rows name an operator; 1 of 1 named operators have a stated owner. Flows: no stated ships_to flow of bauxite from this country is held yet.
Smelter at Mesaieed, 40 kilometers south of Doha — Aluminum; 660 thousand metric tons. not compared: printed as "aluminum", not bauxite, mined.
Operator: Qatar Aluminium Ltd. Q.S.C.
Derived and lead relations are never counted here. How the ratio is computed
Discussion
Comments use threadkit (permission is participation). Sign in with OrangeCat to write. Fact-check is the same assistant as Ask, grounded in the corpus.
Loading comments…