Grid interconnection queues
The administrative line to be connected to the electricity grid. In several markets it is the slowest step in building anything.
judged, with a citation claimed, no citationNumber: papers, preprints and grants the feeds collected — unreviewed
Searched for “interconnection queue”, “grid interconnection”, “hosting capacity” in titles and abstracts.
All stagesFundamental researchApplied / labPilot / demonstrationEarly commercialAt scaleNewestMost cited
Fundamental research — readiness 1 to 2 of the nine-point scale. Evidence it takes: A paper or preprint on the underlying physics or chemistry; a basic-research grant.
Directory companies in this research
- Samsung Electronics005930 KSvia Samsung Electronics1 (Computed: Items per institution per bottleneck, counting each item once per institution named on it by the source; a company is matched to the directory only when every distinguishing word of both names agrees.) itemlatest 2026-11-26
Named on a collected paper or grant, matched to the directory by the strict name rule. A company not in the directory, or spelled differently by the source, is not shown here.
Collected by the feeds
- Constraint-Aware Surrogate-Assisted PV Hosting Capacity Planning for Port Microgrids: Performance and Computational Trade-Offs
U.S. ports are increasingly adopting electric cargo-handling equipment, shore power and on-site photovoltaics (PV) to reduce port-related emissions. As electrification loads and PV generation interact with port-serving distribution feeders, planning must account for feeder…
Charleston Southern UniversityWuhan University of TechnologyElectric Power Research Institute
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Year-Resolved Quasi-Static Time-Series Assessment of Photovoltaic Hosting Capacity in a 59-Bus 22 kV Egyptian Distribution Network Model
A year-resolved quasi-static time-series (QSTS) assessment of the 59-bus, 22 kV Cairo distribution network model of [11] (peak load 50.34 MW) gives an overvoltage-limited photovoltaic (PV) hosting capacity (HC) of 165% of peak load (HC95 over 200 random placements, 1.02 p.u…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Data-driven deduction method for comprehensive evaluation of hosting capacity of active distribution network
State Grid Hubei Electric Power Company Electric Power Research Institute
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Power quality and hosting capacity assessment of distribution networks under increased penetration of EV charging load
Increasing concerns over climate change and depleting fossil fuel reserves are the key drivers reshaping the global energy landscape, within which the electrification of road transportation has emerged as a dominant trend. The integration of millions of electric vehicles (EVs)…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- A Novel Approach Based on Second-Order Cone Programming for Determining the Minimum Hosting Capacity in Power Distribution Networks
This paper proposes a novel approach based on Second-Order Cone Programming (SOCP) to estimate the Minimum Hosting Capacity (HC_min) in power distribution networks with high photovoltaic (PV) penetration. HC_min is defined as the maximum distributed generation (DG) capacity that…
Universidad Industrial de Santander
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Stochastic Overvoltage-Limited Hosting Capacity Assessment of Photovoltaic Generation in an Egyptian Medium-Voltage Substation Network
The rapid growth of photovoltaic (PV) installations under Egypt's net-metering scheme raises the question of how much PV a distribution network can host before operating limits are violated. This paper presents a stochastic, overvoltage-limited hosting capacity (HC) assessment of…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Feasibility-guided multi-round particle swarm optimization for AC contingency-constrained large-load hosting capacity assessment
Seoul National UniversitySamsung (South Korea)Samsung Electronics in the directory005930 KSvia Samsung Electronics
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Beyond Hosting Capacity: A Multidimensional Diagnostic for Renewable Integration in Low-Inertia Power Systems
Renewable penetration indicators quantify how much generation a power system integrates while remaining blind to what limits further integration and where that limitation originates. This paper introduces the Multi-dimensional Renewable Integration Diagnostic (MRID), to our…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Quantifying the hosting capacity value of workload flexibility for AI data centers: A two-stage electricity-computation co-optimization framework
Grid connection constraints increasingly limit the expansion of AI data centers, yet the additional hosting capacity enabled by computational workload flexibility remains insufficiently quantified. This paper develops a two-stage electricity--computation co-optimization framework…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- N-1 Security constrained Hosting Capacity Assessment for Ultra Large-scale Data Center with Workload Flexibility
Transmission network security can substantially alter where large-scale data centers can connect and how much workload flexibility can unlock. This paper develops a hosting-capacity framework that couples computing demand, batch workload scheduling, and N-1 security constraints…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- A probabilistic region-based model for evaluating the integrated hosting capacity of photovoltaics and electric vehicles in power distribution networks
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Signed Voltage Sensitivity and Trip-Aware Positive-Neighbour Control for Photovoltaic Hosting Capacity in a Four-Wire Rural Low-Voltage Network
Photovoltaic hosting capacity in low-voltage (LV) networks is usually assessed with balanced or three-wire models, although much of European rural distribution is four-wire with predominantly single-phase connections, where the neutral couples the phases and the voltage response…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Harmonic-Constrained Hosting Capacity of Active Distribution Networks Using ESS Compensation and Certified Adaptive Decision-Tree Envelopes
Active distribution networks increasingly rely on coordinated inverter-based resources to accommodate renewable generation, while harmonic limits constrain the capacity that can be connected. This paper proposes a harmonic optimal power flow (HOPF) method with active…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- GRIDWELL Atlas: a self-updating screen to find the abandoned oil and gas wells best placed to add Enhanced Geothermal System electricity to the U.S. grid
Drilling is the largest single cost of geothermal electricity, and the United States already has about 4.1 million abandoned oil and gas wells. However, the potential of these wells for Enhanced Geothermal Systems (EGS) has been screened at each well's own depth only for…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- AC Assessment of DC Power Flow Screening for Data Center Hosting Capacity and Siting
A screening procedure based on direct current (DC) power flow estimates the data center hosting capacity of a candidate bus, termed the DC-screened capacity, and selects the generator commitment that supports it. This paper assesses that estimate under the alternating current…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- Smart Inverter-Based Enhancement of Photovoltaic Hosting Capacity in the IEEE 33- Bus Distribution Network
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Coordinating Distributed AI Servers with Industrial Loads to Reduce Grid-Interconnection Needs
We show that co-locating distributed AI servers with industrial demand and coordinating AI workloads with production loads can substantially reduce the additional grid interconnection that AI computing requires. Grid interconnection is increasingly constraining the expansion of…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- From Techno-Economic Optimization to Implementable Low-Carbon Residential PV Systems Using an Integrated Rooftop, Grid, and Decarbonization Framework
Techno-economic optimization of residential photovoltaic (PV) systems often yields continuous capacities that are not directly buildable. This study develops an integrated framework linking techno-economic sizing, discrete component selection, rooftop geometry, low-voltage grid…
Instituto Politécnico NacionalUniversidad del Istmo
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Assessing Data Center Hosting Capacity Considering Electromagnetic Transient Dynamics
Hosting capacity is commonly assessed with steady-state optimization, which leaves the dynamic response of the data center and the grid at the resulting operating point untested. This paper assesses candidate data center capacities by coupling a unit commitment (UC) model with…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- Constraint-Aware Calibration of Power-Flow Surrogates: DG Hosting Capacity as a Downstream Application
Power-flow surrogates reduce the cost of repeated distribution-network studies, but low regression error does not guarantee reliable feasibility decisions near technical limits. We evaluate constraint-aware calibration for a continuous-output Base–Increment multilayer perceptron…
Universidad Nacional de CuyoNational University of San Luis
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Scalable hosting capacity calculation for distribution networks
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- V2g (Vehicle To Grid) Stability And Power Quality
The increasing penetration of renewable energy sources, distributed energy resources (DERs), and electric vehicles (EVs) has created new opportunities for improving the flexibility, reliability, and sustainability of modern power systems. Smart grid technology integrates advanced…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedPDF
- Priority-Aware Firm and Flexible Capacity Quantification for Large-Load Interconnection
We study how to unlock existing transmission capacity to accelerate large-load interconnection under differentiated quality-of-service (QoS) requirements. We establish an efficient framework to quantify firm and flexible hosting capacities and assess marginal values of grid…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- Optimal siting and sizing of pumped-storage power plants in a multi-HVDC-infeed regional power grid via AC security feedback
In regional power grids with multiple high-voltage direct-current (HVDC) infeeds, renewable-generation variability, variations in HVDC power transfers, and network constraints are strongly coupled, while planning solutions derived from DC power-flow models may not ensure AC…
State Grid Corporation of China (China)Hunan University
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Traffic-energy coordinated planning of highway self-contained energy system for electric vehicle hosting capacity enhancement under multiple uncertainties
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- MAC+: Mobility-Aware Co-Expansion Planning for Distribution Grid and Electric Vehicle Charging Infrastructure
We study the least-cost co-expansion of power distribution networks and public charging ports to accommodate the growth of electric vehicles (EVs). Our approach, MAC+, exploits the flexibility of charging along each EV's itinerary and coordinates it across the fleet to reduce the…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- Impact of operational functionalities on the hosting capacity limits for photovoltaic distributed energy resources integration in electrical distribution systems
La integración de recursos energéticos distribuidos renovables plantea desafíos técnicos en los sistemas de distribución debido al cumplimiento de restricciones operativas. Este trabajo desarrolla una metodología para evaluar el impacto de las funcionalidades de operación sobre…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewed
- Battery Storage Sizing for Data-Center Flexibility Under Uncertain Grid Hosting Capacity: Firm Supply Versus Load Curtailment
The rapid growth of data-center (DC) demand is challenging transmission networks, where available capacity may accommodate new loads during most hours but not at all times. DC flexibility can enable earlier grid connections by reducing network withdrawals during congestion, while…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Residential Vehicle-to-Grid Deployment: A United States-Based Stakeholder Perspective
The integration of vehicle-to-grid (V2G), in which electric vehicle (EV) owners can send electricity from their vehicles back to the grid, is an emerging solution to enhance grid resilience. However, V2G deployment in the United States lags behind many other countries. This can…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- Multi-objective optimization of PV-wind hybrid green hydrogen systems: Sizing, economics and grid-interconnection effects
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Grid-Aware Planning and Hosting Capacity Assessment of Large-Scale Fast Electric Vehicle Charging Under AC Power Flow Security Constraints
The connection of numerous electric vehicle charging stations (EVCS) to the grid is creating challenges for grid operation. In this study, a power flow based optimization approach was used to determine the optimal placement of EVCS units within the IEEE 118-bus power system and…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Data-Driven Surrogate Modeling for Voltage Security Assessment and EV Hosting Capacity in Solar-Integrated Distribution Networks
Today’s distribution networks face challenging voltage stability problems from the increasing deployment of electric vehicles (EVs) and solar photovoltaic (PV) systems. The current methods of voltage stability assessment rely on computation-intensive power flow analysis, thereby…
Benazir Bhutto Shaheed University of Technology and Skill DevelopmentTun Hussein Onn University of MalaysiaZiauddin University
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- A Review of EMT Model Submission and Validation Requirements for Expanding IBR and HVDC/DC Grids and the Establishment of an Engineering Process for Domestic Application
The increasing penetration of inverter-based resources (IBRs) and the expansion of HVDC/MTDC and DC grids have made conventional phasor-domain transient (PDT) simulations insufficient for assessing system dynamics, since weak-grid conditions, protection–control interactions…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Optimal Photovoltaic Siting and Sizing for Maximum Hosting Capacity under Thermal and Voltage Limits
— Growing interest in integrating solar energy into electrical grids has significantly increased photovoltaic (PV) penetration. Beyond certain operational thresholds, however, high PV penetration can cause technical grid constraints, including overvoltages and equipment thermal…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Risk-aware hosting-capacity-constrained optimal power flow for renewable-integrated EV charging distribution networks
This paper proposes a Risk-Aware Hosting-Capacity-Constrained Optimal Power Flow (RA-HC-OPF) framework for renewable-integrated electric vehicle (EV) charging distribution networks. The proposed method is designed to move hosting-capacity analysis from a passive post-power-flow…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Innovative High Voltage Direct Current Transmission Systems for Enhancing Energy Efficiency and Sustainable Grid Infrastructure Development
The increasing integration of renewable energy resources, growing electricity demand, and expansion of interconnected power networks have intensified the need for efficient and sustainable electricity transmission infrastructure. High Voltage Direct Current (HVDC) transmission…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Which AI Should Pick Grid Batteries? Forecasting Storage Project Completion in US Interconnection Queues with Language Models, Survival Models and Investor Agents
Most US grid interconnection requests are never built; storage is nearly half of active requests. We ask which AI system best forecasts, when a storage project enters the queue, whether it will be built by a fixed date. On Lawrence Berkeley National Laboratory Queued Up 2026 data…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Coordinated multiarea optimization for hosting capacity enhancement in active distribution networks with high renewable energy penetration
High penetration of distributed photovoltaic generation, electric-vehicle charging, flexible load, and energy storage changes the operating margin of active distribution networks from a static planning quantity to a stochastic and time-varying resource. This paper proposes a…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Adaptive Security-Margin Tracing for Renewable Hosting Capacity Assessment in Radial Distribution Networks
This paper proposes an Adaptive Security-Margin Tracing for Hosting Capacity (ASMT-HC) method for photovoltaic (PV) integration in radial distribution networks (DNs). The method combines voltage, branch-loading, and reverse-power-flow margins through a Composite Security Margin…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Electric Vehicle Hosting Capacity in Distribution Systems: A Critical Review of Distributed Generation Foundations, Unified Assessment, and Emerging Research Directions
Electric vehicle hosting capacity (EV-HC) is increasingly important for distribution-system planning, yet existing reviews provide limited guidance on how mature distributed-generation hosting-capacity (DG-HC) concepts should be transferred to mobility-dependent and potentially…
Prince Sattam Bin Abdulaziz UniversityAhram Canadian UniversityFuzhou UniversityAcademy of Scientific Research and Technology
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- THE SITING WALL : On the Datacenter Moratorium Movement, the Infrastructure Constraint the S-1 Names as Material, and the Architecture That Has No Siting Problem
On October 26, 2026, Anthropic filed a Form S-1 with the U.S. Securities and ExchangeCommission. The filing discloses existential risk at length. It also discloses somethingnearer, and the contrast between the two is the subject of this paper. Among the risk factors:"Opposition…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Enhancing Renewable Energy Hosting Capacity in Unbalanced Microgrids via Empowering Smart Inverters
The rapid growth of photovoltaic (PV) generation, wind energy and plug-in electric vehicle (PEV) charging creates voltage unbalance, feeder congestion and power losses that limit the hosting capacity (HC) of renewable energy sources in practical unbalanced microgrids. A recent…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedPDF
- ANN based selective power control in grid connected AC microgrids
Non-linear loads and inverter-interfaced distributed energy resources (DERs) have made harmonic distortion and limited grid hosting capacity two of the most pressing power-quality problems of low-voltage distribution networks. A recently proposed generalized power-based control…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedPDF
- Reserve-Constrained PV–BESS Co-Planning for Operationally Deliverable Hosting Capacity in Active Distribution Networks
Conventional photovoltaic (PV) hosting-capacity (HC) assessment generally focuses on the maximum installable PV capacity subject to voltage and thermal constraints. At the same time, renewable curtailment and the remaining operational flexibility of battery energy storage systems…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Exclusive software license, including hosted interfaces, APIs, connectors, documentation, configuration files and updates, to use, market, lease and sublicense object code access to licensor's Fleet Orchestration Management Application (FOMA) to manage and orchestrate authorized compute and energy pod deployments to approved end customers, and in connection with the 'AetherPod VG100' white label product and related compute capacity, AI processing, orchestration, hosting, capacity reservations, data processing, and FOMA-enabled services.
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Developments and Prospects of Voltage Source Converter‐High‐Voltage Direct Current Transmission Technology
ABSTRACT Voltage source converter‐high‐voltage direct current (VSC‐HVDC) transmission is a key technology for renewable‐energy integration, regional grid interconnection and passive‐network power supply. This review summarises the development history of VSC‐HVDC, the evolution of…
China Southern Power Grid (China)South China University of Technology
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Sustainable Smart Grid Resilience and Renewable Integration Using Multi-Agent Reinforcement Learning
Sustainable energy systems must accommodate renewable generation to ensure dependable service during severe disruptions. This paper presents a decentralized multi-agent system that integrates feeder reconfiguration, Q-learning-based restoration, coordinated battery dispatch, and…
University of Nevada, RenoUniversity of Central Florida
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Research data for: "Multi-Objective PV Hosting Capacity Optimization in Radial Distribution Feeders"
Input data, executable scientific MATLAB code and final computational results supporting “Multi-Objective PV Hosting Capacity Optimization in Radial Distribution Feeders”. The deposit contains the modified balanced IEEE 34 network and an adapted 108-bus Oberrhein component…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Grid-Impact Limits of High-Penetration Residential Storage and Vehicle-to-Grid in Emerging Energy Communities
As the energy transition accelerates, high-penetration residential Battery Energy Storage Systems (BESS) and bidirectional Vehicle-to-Grid (V2G) capabilities promise enhanced local resilience and flexibility. However, their uncoordinated deployment presents significant…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Congestion Price Uncertainty From Interconnection Queue by Monte Carlo Sampling
The generation interconnection queue adds discrete uncertainty to power grid congestion price estimates on the project planning timescale. The conventional approach to this uncertainty is to make an informed guess of the single or few most likely configurations of generators that…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- Service-Aware Hosting Capacity Assessment of Edge Data Centers with Workload Flexibility
The growing demand for edge computing, content delivery, and AI services is driving the interconnection of edge data centers (DCs) with distribution networks. Before interconnection, utilities evaluate how much DC capacity can be accommodated without violating feeder current and…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- Impact of Security Modeling Fidelity on Hyperscale Data Center Hosting Capacity Assessment
This paper assesses hyperscale data center hosting capacity in transmission grids. Hosting capacity (HC) analysis quantifies the maximum additional load a bus can accommodate without violating operational constraints. This paper defines data center HC as the maximum…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- Using cross-regional grid interconnection to relieve growing energy storage demand in renewable energy integration: A case study from China
With the rapid growth of wind and solar generation, power systems face increasing balancing and energy storage needs. Cross-regional interconnection provides spatial flexibility through tie-line power exchange, yet the implications of tie-line scheduling flexibility for capacity…
Zhejiang UniversityNARI Group (China)
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Integration of Distributed Solar Energy into Saudi Smart Distribution Grids: Voltage Regulation, Hosting Capacity and Protection Challenges
The deployment of distributed solar photovoltaic generation is leading Saudi Arabia's distribution networks to move from a primarily one-way arrangement to a more actively managed system in which power, voltage and fault current can change direction at various stages of…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Modeling and Simulation of Renewable Energy Integration into Smart Grid Systems in Saudi Arabia
Saudi Arabia is making the transition from an electricity system based mainly on hydrocarbons to one in which solar photovoltaic and wind power make up a much larger share, and this is leading to a demand for simulation tools that are able to account for variability…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Energy infrastructure for AI data centers: A critical review of grid integration, techno-economic challenges, and future pathways
Artificial intelligence (AI) workloads are rapidly changing the energy landscape of today's data centers, both in terms of total electricity usage and power density at the facility level. The ongoing deployment of large-scale AI training and inference infrastructure is further…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Coordinated integration of renewables, STATCOMs, and V2G for hosting capacity improvement under uncertainty
Abstract Although incorporating renewable energy sources (RESs) into electric distribution networks (EDNs) offers significant sustainability and environmental benefits, improper management of RESs may threaten the technical performance of the network. To assess the safe…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- DYNAMIC AND SECURITY-CONSTRAINED ASSESSMENT OF PHOTOVOLTAIC HOSTING CAPACITY IN A LOW-INERTIA POWER SYSTEM: IEEE 39-BUS VALIDATION AND EMPIRICAL APPLICATION TO SENEGAL
As phоtоvоltaiс (PV) penеtratiоn rises aсrоss interсоnnеcted grids, hоsting cаpасity (HC) саn nо lоnger be inferred sоlely frоm vоltagе mаrgins аnd еquipment-lоаding соnstraints. The соmbinеd effeсts оf rеducеd synchrоnоus inеrtia аnd sоlar variability requirе a unified treatment…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIalso at doi.org
- Unlocking Grid Hosting Capacity for EV Chargers via Non-Firm Connection: A Methodology for Power Limit Determination
The rapid growth of the electric vehicle (EV) fleet places increasing strain on existing power distribution networks, often requiring costly infrastructure upgrades to accommodate rising charging demand. Non-firm connection, which allows temporary power limitation of EV charging…
Kuzbass State Technical UniversityRussian Academy of SciencesEnergy Research Institute
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- An integrated optimization framework for adaptive smart inverter Volt/Var control to enhance voltage stability and PV hosting capacity in PV-BESS distribution networks
The increasing penetration of photovoltaic (PV) systems in distribution networks has intensified voltage regulation challenges and constrained photovoltaic hosting capacity (PVHC), necessitating advanced coordination of distributed energy resources. This study presents an…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Decision-Gated Surrogate-Assisted Stochastic Optimization with Independent High-Fidelity Certification for Photovoltaic Hosting-Capacity Planning
High photovoltaic (PV) penetration planning requires repeated nonlinear PV and power-flow evaluations under uncertain irradiance and demand, particularly when two competing objectives, penetration and total electrical loss, are optimized simultaneously subject to reliability…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- Critical analysis of hybrid electric vehicle hosting capacity for renewable-dependent sustainable energy networks
Recent evolutions in emerging energy technologies illustrate that the transportation sector is undergoing tremendous changes in uptaking different models of vehicular systems. In the transportation area, hosting capacity implies the maximum number of hybrid electric vehicles that…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Co-benefits of residential heat electrification through interstate grid interconnections in Northeast Asia
This study examines the potential ambient air quality and associated human health co-benefits of residential heating electrification powered by the Asia Supergrid, which connects the China-North, Korea, and Japan-West regions. By linking a bottom-up power sector optimization…
Yonsei UniversityUniversity of Wisconsin–MadisonInternational Institute for Applied Systems Analysis
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Connection order matters: Path-dependent hosting capacity in distributed generation interconnection queues
Grid access queues for distributed generation (DG) are processed chronologically (FIFO) worldwide, under the implicit assumption that the connection order does not affect total accommodated capacity. This paper shows that the assumption breaks down under high penetration: because…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- Multi-scenario optimization of electric vehicle charging stations hosting capacity considering renewable integration, harmonic mitigation, and vehicle-to-grid support
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Three-stage DG–ESS planning using Tianji’s horse racing optimization for hosting capacity enhancement in radial distribution networks
Distributed generation based on renewable energy sources is expanding rapidly in African and global distribution networks. Still, its hosting capacity is often constrained by voltage violations, thermal overloads, and increased technical losses. This paper proposes a three-stage…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Powering Hyperscale AI Data Centers with Off-Grid Solar, Battery, and Hydrogen
Abstract Artificial intelligence (AI) data centers are emerging as a major source of electricity demand, driving interest in renewable-powered and off-grid energy systems as grid interconnection delays, generator shortages, and infrastructure constraints complicate high load…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Enhancing DER hosting capacity of unbalanced low-voltage distribution networks with network exchangers: An Australian case study
The rapid growth and subsequent utilization of distributed energy resources (DERs), particularly in low-voltage networks, is pushing distribution networks to the brink of their hosting capacity. Distribution network operators, especially in DER-rich countries such as Australia…
Monash UniversityCommonwealth Scientific and Industrial Research Organisation
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Integrated Data-Driven Framework for Rooftop PV Impact Assessment in Distribution Networks Using Net-Load Forecasting and Hosting Capacity Analysis
The increasing use of rooftop photovoltaic (PV) systems in distribution networks can lead to operational challenges, including feeder overloading, reverse power flow, fluctuating net-load characteristics, and future hosting-capacity constraints. This research presents an…
Muscat CollegeMehran University of Engineering and TechnologyCollege of Applied Sciences, NizwaA'Sharqiyah UniversityDhofar University+3 more
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Grid Topology Optimization for Congestion Management Under High Renewable Penetrations and Discrete Load Growth
Transmission grids are increasingly stressed by the fluctuating nature of renewable energy sources and by increasing electricity demand. Such grids were mainly built for a different generation fleet and load conditions. Grid topology optimization offers the possibility to…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDFalso at doi.org
- The U.S. Interconnection Queue System: Cascading Vulnerability Analysis and a Resilience Engineering Framework
As of 2025, the U.S. interconnection queues, the grid-access gateway for new generation and storage, contain roughly 8,200 projects totaling 2,061 GW of capacity. Only 13% of capacity queued in 2000-2020 (19% by project count) has reached operation. We argue that the queue…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDF
- Efficient Quantile-Resolved Hosting Capacity Assessment on Nodal Level for Low-Voltage Grids
Hosting capacity - the maximum additional capacity a network can accommodate without violating operational limits - is a key metric in distribution system planning and operation. Decisions on grid reinforcements and the deployment of flexibility management require not only the…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDF
- Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems
Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDF
- Minimizing Grid Interconnection Capacity Requirements for AI Data Centers: A Developer-Side Planning Framework with Onsite Resources and Workload Flexibility
Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDF
- Beyond the Grid: Cost, Carbon, and Capital Requirements of On-Site Power Technologies for AI Data Centers
Interconnection queues, not electricity prices, now govern where data centers can be built, and the standard levelized-cost comparison answers a question no developer faces: it assumes a load profile, freezes the grid price while modeling the demand that moves it, and quotes…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDF
- A Phased Development Framework Enabling Islanded Operation of Sustainable AI Data Centers With Onsite Grid-Following and Grid-Forming Energy Architectures
As hyperscale and colocation AI data centers continue to expand, the electric grid is increasingly required to support large, concentrated loads, with individual facilities ranging from 500 MW to 2 GW. Current projections estimate that approximately 50 GW of AI data center…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDF
- Power-Flexible AI Data Centers: A New Paradigm for Grid-Responsive Compute
The rapid expansion of artificial intelligence (AI) infrastructure is driving unprecedented growth in electricity demand from data centers. Traditional power-system planning treats large computing facilities as inflexible peak loads, leading to costly infrastructure upgrades and…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDF
- CONDUCTOR: An LLM-Orchestrated Digital Twin for Uncertainty-Aware Distribution Grid Operations
Large language models (LLMs) are proposed as natural-language interfaces to power system analysis, yet existing frameworks are validated almost exclusively on synthetic benchmarks and support only deterministic studies. We present CONDUCTOR, an LLM-orchestrated digital twin for…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDF
- Hosting Capacity Assessment and Enhancement for Edge Data Centers in Active Distribution Networks
With the increasing demand for edge computing and AI-driven workloads, integrating small and medium-sized edge data centers into distribution networks has become increasingly important. This paper investigates the hosting capacity of distribution networks for data center…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDF
- OptiQU: Coordinated Multi-Level Voltage and Reactive Power Control for Enhanced Voltage Quality and Secure Grid Operation
Modern low-voltage (LV) distribution grids face rising shares of photovoltaic generation and high-power loads such as heat pumps and electric vehicle charging stations. Due to high simultaneity, voltage constraints often become binding before thermal limits, triggering costly…
Fundamental research · No laboratory or pilot wording.From arXiv · not yet reviewedPDF