West Africa · GN
Guinea
34% of world bauxite / aluminium (mine production, bauxite, 2025); 16 export measures.
- extraction
Shares and ranks computed from USGS, EIA and WNA tables; rules from the policy register; measures from the OECD inventory. On the map →
- 1stIn world bauxite / aluminiumtop three in 1 of 2 resources listed
- 0Companies herenone recorded yet
- 0Rules it setspolicy instruments on record
- 0Eventsnone accepted yet
| Figure | Value | Note |
|---|---|---|
| In world bauxite / aluminium | 1st | top three in 1 of 2 resources listed |
| Companies here | 0 | none recorded yet |
| Rules it sets | 0 | policy instruments on record |
| Events | 0 | none accepted yet |
01What it produces
Also produces, small shares: hydropower <0.1% · 81st (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.).
02Where it restricts, and is restricted
Exports it restricts
Source: OECD Inventory of Export Restrictions on Critical Raw Materials (2024 data)SourcedOECD Inventory of Export Restrictions on Critical Raw Materials (2024 data)Open the source → measures on 11 resources; open a row for what each measure does.
Gold
Licensing 1
- Qualified exporters list on ore, metal since 2011-09-09 Legal text ↗
Export tax 4
- Export tax 2% on ore since 2020-01-01 Legal text ↗
- Export tax 3% on metal since 2020-01-01 Legal text ↗
- Export tax 2% on scrap since 2020-01-01 Legal text ↗
- Export tax 1% on ore since 1997-04-12 Legal text ↗
Bauxite / aluminium
Export tax 2
- Export tax 2% on ore, chemical, metal since 2011-09-09 Legal text ↗
- Export tax 2% on scrap since 2011-09-09 Legal text ↗
Antimony
Export tax 1
- Export tax 2% on scrap since 2011-09-09 Legal text ↗
Platinum-group metals
Export tax 1
- Export tax 2% on scrap since 2011-09-09 Legal text ↗
Tungsten
Export tax 1
- Export tax 2% on scrap since 2011-09-09 Legal text ↗
Sanctions that name it
- Restrictive measures in view of the situation in Guinea ↗
Applies: asset freeze and prohibition to make funds available, restrictions on admission · amended 2025-10-13
EU
Export measures: OECD Inventory of Export Restrictions on Critical Raw Materials (2024 data), read 2026-09-25. Sanctions read 2026-11-28 from the EU Sanctions Map and OFAC’s program list; a regime targets what its measures name, not the whole country.
03What this holds up
- Materials qualificationone turn: Years
endowed with Gallium, refined, which gates it.
Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15 · this join is directory join, not a sourced finding
- Circuit boardsone turn: One to two weeks
endowed with Gallium, refined, which gates it.
Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15 · this join is directory join, not a sourced finding
A loop is one design, build and measure turn. Severity is a dated judgement on a 0–12 scale, not a measurement, and the judgements are not added together — the figure shown is the worst single one.
04What we know, and what is missing
- Endowment and output
2 resources measured in USGS, EIA or WNA tables.
Full - Facilities
7 rows in the USGS Minerals Yearbook chapter (2019). Full needs at least 10 stated facility rows.
Thin - Companies
7 operators named by USGS; 0 directory companies.
Full - Law and licensing
0 instruments it issues (0 on licensing); 16 OECD export measures. Full needs at least 3 stated rules on record, including how it licenses extraction or processing (a licence regime, permit or procedure).
Thin - Trade
no source in the repository yet. Full needs at least 3 stated named counterparties.
Empty - Events
0 accepted events in its jurisdiction. Full needs at least 5 stated dated events.
Empty - People and labs
0 labs in the register. Full needs at least 3 stated labs or people.
Empty
Only stated rows count; candidate rows and rows worked out by a rule are shown elsewhere and never fill a box. How each box is computed · Send a source for an empty box →
05How complete is this picture
For each resource: the capacity of facilities with a named operator, over the national production figure. Open a row for the working. Capacity is what the named plants can produce, not what they produced: plants run below capacity, so this can pass 100% and is not a share of output. No source here states production per facility, so "named operators made X% of output" is not claimed.
Bauxite / aluminiumnamed capacity / national production · bauxite, mined
63,000 thousand tonnes named ÷ 142,000 thousand tonnes national = 44.4% (exact). All rows of this basis, named or not: 75,100 thousand tonnes (5 rows). The facility table is for 2019 and the national figure for 2024: 5 years apart.
National figure: USGS, World Alumina Refinery and Bauxite Mine Production and Bauxite Reserves ↗ — Mine production, bauxite, 2024: “142,000” (Data in thousand metric dry tons).
Facilities: USGS Minerals Yearbook 2019, Table 2. Structure of the mineral industry (Table2) ↗. 4 of 7 rows name an operator; 4 of 4 named operators have a stated owner. Flows: no stated ships_to flow of bauxite from this country is held yet.
Friguia alumina refinery, Fria — Alumina; 650,000 metric tons. not compared: printed as "alumina", not bauxite, mined.
Operator: Friguia S.A.
Bel Air bauxite mine, near the Cap Verga peninsula — Bauxite; NA metric tons. not added: no capacity printed (NA).
No stated operator
Sangaredi Mine, Kamsar — Bauxite; 50,000,000 metric tons. counted as named.
Operator: Compagnie des Bauxites de Guinée
Dian-Dian Mine, 250 kilometers north of Conakry — Bauxite; 3,000,000 metric tons. counted as named.
Operator: Compagnie des Bauxites de Dian-Dian S.A.
Debele Mine, 20 kilometers southwest of Kindia and 100 kilometers northeast of Conakry — Bauxite; 10,000,000 metric tons. counted as named.
Operator: Compagnie des Bauxites de Kindia S.A.
Friguia Mine, Fria Prefecture, Boke Region — Bauxite; 2,100,000 metric tons. listed, not named.
No stated operator
Boke Mine, Boke, 168 kilometers north of Conakry — Bauxite; 10,000,000 metric tons. listed, not named.
No stated operator
Derived and lead relations are never counted here. How the ratio is computed
Discussion
Comments use threadkit (permission is participation). Sign in with OrangeCat to write. Fact-check is the same assistant as Ask, grounded in the corpus.
Loading comments…