Central Asia · KZ
Kazakhstan
39% of world uranium (mine production, 2024); 19 export measures.
- extraction
- research
Shares and ranks computed from USGS, EIA and WNA tables; rules from the policy register; measures from the OECD inventory. On the map →
- 1stIn world uraniumtop three in 2 of 14 resources listed
- 0Companies herenone recorded yet
- 0Rules it setspolicy instruments on record
- 4Eventsnewest 2026-09-21
| Figure | Value | Note |
|---|---|---|
| In world uranium | 1st | top three in 2 of 14 resources listed |
| Companies here | 0 | none recorded yet |
| Rules it sets | 0 | policy instruments on record |
| Events | 4 | newest 2026-09-21 |
01What it produces
Also produces, small shares: oil 2.4% · 11th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), silver 2.4% · 12th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), iron ore 1.3% · 11th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), phosphates 0.8% · 17th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), antimony 0.7% · 8th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), natural gas 0.7% · 24th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), hydropower 0.2% · 46th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.).
02Where it restricts, and is restricted
Exports it restricts
Source: OECD Inventory of Export Restrictions on Critical Raw Materials (2024 data)SourcedOECD Inventory of Export Restrictions on Critical Raw Materials (2024 data)Open the source → measures on 6 resources; open a row for what each measure does.
Bauxite / aluminium
Prohibition 3
- Export prohibition on scrap since 2024-11-02, until 2025-05-02 Legal text ↗
- Export prohibition on scrap since 2024-05-05, until 2024-11-05 Legal text ↗
- Export prohibition on scrap since 2023-11-07, until 2024-05-07 Legal text ↗
Export tax 2
- Export tax 0 %, EUR/1000 kg on metal since 2021-03-29 Legal text ↗
- Export tax 10%, but not less than 76 EUR per tonne %, EUR/1000 kg on metal, scrap since 2020-11-30 Legal text ↗
Copper
Prohibition 3
- Export prohibition on scrap since 2024-11-02, until 2025-05-02 Legal text ↗
- Export prohibition on scrap since 2024-05-05, until 2024-11-05 Legal text ↗
- Export prohibition on scrap since 2023-11-07, until 2024-05-07 Legal text ↗
Licensing 1
- Licensing requirement on ore, intermediate since 2015-06-03 Legal text ↗
Export tax 1
- Export tax 10%, but not less than 84 EUR per tonne %, EUR/1000 kg on scrap since 2020-11-30 Legal text ↗
Silver
Licensing 1
- Licensing requirement on ore, metal, scrap since 2015-06-03 Legal text ↗
Other 2
- Restriction on customs clearance point for exports on ore, metal, scrap since 2015-06-03 Legal text ↗
- Other export measures on metal since 2015-06-03 Legal text ↗
Coal
Prohibition 1
- Export prohibition on ore since 2023-11-26, until 2024-05-26 Legal text ↗
Licensing 1
- Qualified exporters list on ore since 2023-12-01 Legal text ↗
Gold
Licensing 1
- Licensing requirement on ore, metal, scrap since 2015-06-03 Legal text ↗
Other 1
- Restriction on customs clearance point for exports on ore, metal, scrap since 2015-06-03 Legal text ↗
Platinum-group metals
Licensing 1
- Licensing requirement on scrap since 2015-06-03 Legal text ↗
Other 1
- Restriction on customs clearance point for exports on scrap since 2015-06-03 Legal text ↗
Sanctions that name it
No EU regime and no OFAC country program. Thematic lists can still name its people and companies.
Export measures: OECD Inventory of Export Restrictions on Critical Raw Materials (2024 data), read 2026-09-25. Sanctions read 2026-11-28 from the EU Sanctions Map and OFAC’s program list; a regime targets what its measures name, not the whole country.
03What has happened
- 2026-09-21NeutralPolicyKZ RU
Kazatomprom on Russia's revised approval procedure for sulphuric acid exports (Resolution 1158)
Uranium conversion and enrichment
sightlineu3o8.com ↗secondary source
The sentence that says so
“Based on the information currently available, these measures do not prohibit sulphuric acid exports. Rather, they introduce a revised approval procedure for export volumes, which is expected to remain in effect until 31 December 2026.”
- 2026-08-21TightensCapacityKZ
Kazatomprom: construction at the TQZ sulphuric acid plant site suspended after specimens found
Uranium conversion and enrichment
investegate.co.uk ↗secondary source
The sentence that says so
“construction works in the affected area have been suspended pending official permit from relevant state authorities to resume work.”
- 2026-03-20NeutralCapacityKZ
Kazatomprom says 2026 production guidance remains subject to sulphuric acid availability
Uranium conversion and enrichment
kazatomprom.kz ↗official source
The sentence that says so
“The 2026 production guidance remains subject to sulphuric acid availability.”
- 2025-08-22TightensCapacityKZ
Kazatomprom announces a roughly 10% cut in planned 2026 uranium production
Uranium conversion and enrichment
world-nuclear-news.org ↗secondary source
The sentence that says so
“The national atomic company of Kazakhstan has announced plans for a roughly 10% cut in its uranium production in 2026, saying it does not view the current supply-demand balance and existing uncovered demand as sufficient to incentivise a return to its 100% levels at this time.”
04What we know, and what is missing
- Endowment and output
14 resources measured in USGS, EIA or WNA tables.
Full - Facilities
35 rows in the USGS Minerals Yearbook chapter (2023).
Full - Companies
19 operators named by USGS; 0 directory companies.
Full - Law and licensing
0 instruments it issues (0 on licensing); 19 OECD export measures. Full needs at least 3 stated rules on record, including how it licenses extraction or processing (a licence regime, permit or procedure).
Thin - Trade
no source in the repository yet. Full needs at least 3 stated named counterparties.
Empty - Events
4 accepted events in its jurisdiction. Full needs at least 5 stated dated events.
Empty - People and labs
0 labs in the register. Full needs at least 3 stated labs or people.
Empty
Only stated rows count; candidate rows and rows worked out by a rule are shown elsewhere and never fill a box. How each box is computed · Send a source for an empty box →
05How complete is this picture
For each resource: the capacity of facilities with a named operator, over the national production figure. Open a row for the working. Capacity is what the named plants can produce, not what they produced: plants run below capacity, so this can pass 100% and is not a share of output. No source here states production per facility, so "named operators made X% of output" is not claimed.
Uraniumnamed capacity covers the national figure (capacity can exceed output) · uranium (U) content, mined
24,000 tonnes named ÷ 21,109 tonnes national = 113.7% (exact). All rows of this basis, named or not: 24,000 tonnes (1 row).
National figure: WNA, Production from mines (tonnes U) ↗ — Mine production, 2023: “21,109” (tonnes U (uranium metal content); identified resources are tonnes U recoverable to $130/kgU as of 1 January 2025).
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 2 of 2 rows name an operator; 17 of 17 named operators have a stated owner. Flows: 5 stated flow(s) are held, but no national export volume for uranium is in our sources to compare them with.
Plant in Stepnogorsk, Aqmola Province — Rare earth elements, recovered from uranium-ore residue; 1500 metric tons. not compared: the row does not say whether it counts metal content or gross tonnage.
Operator: Summit Atom Rare Earth Co. LLP
16 places, one capacity printed for all — Uranium, U content; 24000 metric tons. counted as named.
Operators (16): Akbastau JV · APPAK LLP · Baiken-U LLP · JV Akbastau JSC · JV Budyonovskoye LLP · JV Inkai LLP · JV Katco LLP · JV Khorasan-U LLP · JV Southern Mining and Chemical Co. · JV Zarechnoe JSC · Karatau LLP · Kazatomprom-SaUran LLP · Kyzylkum LLP · PE Ortalyk LLP · RU-6 LLP · Semizbai-U LLP
Locations (16)
- Blocks 1, 3, and 4 of the Budenovskoe deposit, Sozak Region, Turkistan Province
- West site of Mynkuduk deposit, Sozak Region, Turkistan Province
- Kharasan- 2 of and southern flank of North Kharassan deposit, Qyzylorda Province
- Blocks 1, 3, and 4 of Budeonovskoe deposit, Turkistan Province
- Block No. 6 and 7 of the Budenovskoe deposit, Sozak Region, Turkistan Province
- Blocks 1, 2, and 3 of the Inkai deposit, Sozak Region, Turkistan Province
- Block No. 2 (Tortkuduk) of the Moinkum deposit and Block No. 1 (South) of the Moinkum deposit, Sozak Region, Turkistan Province
- Khorasan-1 area of the Northern Khorasan deposit, Zhanakorgan Region, Qyzylorda Province
- Akdala Mine and Site No. 4 of the Inkai deposit, Sozak Region, Turkistan Province
- Block 2 of the Budenovkoe deposit, Turkistan Province
- Kanzhugan, Central Moyynkum (area 3), South Moyynkum Unavas, and Mynkuduk mines, Sozak Region, Turkistan Province
- Khorasan-1 area of the Northern Khorasan deposit, Mine, Qyzylorda Province
- Central site of Mynkuduk deposit, Turkistan Province
- North and South Karamurun deposit, Qyzylorda Province
- Irkol Mine in Qyzylorda Province and Semizbai Mine on the border of North Kazakstan and Aqmola Province
- Zarechnoye and South Zarechnoye deposit, Olrarski Region, Turkistan Province
Bauxite / aluminiumnamed capacity covers the national figure (capacity can exceed output) · bauxite, mined
5,000 thousand tonnes named ÷ 4,780 thousand tonnes national = 104.6% (exact). All rows of this basis, named or not: 5,000 thousand tonnes (3 rows). The facility table is for 2023 and the national figure for 2024: 1 year apart.
National figure: USGS, World Alumina Refinery and Bauxite Mine Production and Bauxite Reserves ↗ — Mine production, bauxite, 2024: “4,780” (Data in thousand metric dry tons).
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 5 of 5 rows name an operator; 2 of 2 named operators have a stated owner. Flows: no stated ships_to flow of bauxite from this country is held yet.
Krasnooktyabrskoye bauxite mining unit, West Turgay region, Qostanay Province — Bauxite; 3700000 metric tons. counted as named.
Operator: Aluminium of Kazakhstan JSC
Krasnogorsky site, Qostanay Province — Bauxite; 300000 metric tons. counted as named.
Operator: Aluminium of Kazakhstan JSC
Mine No. 9, Qostanay Province — Bauxite; 1000000 metric tons. counted as named.
Operator: Aluminium of Kazakhstan JSC
Plant in the city of Pavlodar, Pavlodar Province — Alumina; 1600000 metric tons. not compared: printed as "alumina", not bauxite, mined.
Operator: Aluminium of Kazakhstan JSC
Kazakhstan Electrolysis Plant (KEZ), Pavlodar Province — Aluminum, primary; 280000 metric tons. not compared: printed as "aluminum, primary", not bauxite, mined.
Operator: Kazakhstan Aluminum Smelter JSC
Iron orenamed capacity / national production · usable iron ore, gross weight
22,870 thousand tonnes named ÷ 37,000 thousand tonnes national = 61.8% (exact). All rows of this basis, named or not: 25,270 thousand tonnes (2 rows). The facility table is for 2023 and the national figure for 2024: 1 year apart.
National figure: USGS, World Mine Production and Reserves ↗ — Mine production, usable-ore, 2024: “37,000” (Data in thousand metric tons, usable ore; reserves in million metric tons).
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 2 rows name an operator; 1 of 1 named operators have a stated owner. Flows: no stated ships_to flow of iron from this country is held yet.
Sokolovsky, Sarbaisky, Kacharsky, and Korzhinkolsky pit mines and Sokolovsky underground mine in Qostanay Province — Iron ore, marketable, gross weight; 22870000 metric tons. counted as named.
Operator: JSC Sokolov-Sarbai Mining Production Association
Lisavosk Mine in Qostanay Province, Kentobe and Atasu mines in Qaraghandy Province, and Atansor Mine in Aqmola Province — Iron ore, marketable, gross weight; 2400000 metric tons. listed, not named.
No stated operator
Coppernamed capacity / national production · copper content, mined
442 thousand tonnes named ÷ 724 thousand tonnes national = 61.0% (exact). All rows of this basis, named or not: 519 thousand tonnes (16 rows). The facility table is for 2023 and the national figure for 2024: 1 year apart.
National figure: USGS, World Mine and Refinery Production and Reserves ↗ — Mine production, 2024: “724” (Data in thousand metric tons, copper content).
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 12 of 19 rows name an operator; 3 of 6 named operators have a stated owner. Flows: 4 stated flow(s) are held, but no national export volume for copper is in our sources to compare them with.
Vesenne-Aralchinskoye Mine, Aqtobe Province — Ore, recoverable, Cu content; 4500 metric tons. counted as named.
Operator: Aktyubinskaya Mednaya Kompaniya LLP
Kounrad Mine, Qaraghandy Province — Ore, recoverable, Cu content; 5000 metric tons. listed, not named.
No stated operator
Sayak Mine, Qaraghandy Province — Ore, recoverable, Cu content; 5000 metric tons. listed, not named.
No stated operator
Shartykul Mine, Zhambyl Province — Ore, recoverable, Cu content; 21000 metric tons. listed, not named.
No stated operator
50th Anniversary of October Mine, Koktau, Aqtobe Province3 — Ore, recoverable, Cu content; 55000 metric tons. counted as named.
Operator: Copper Technology LLP
Priorskoye Mine, Aqtobe Province — Ore, recoverable, Cu content; 8000 metric tons. counted as named.
Operator: Copper Technology LLP
Abyz Mine, Qaraghandy Province — Ore, recoverable, Cu content; 9000 metric tons. listed, not named.
No stated operator
Kusmuryn-Aktabasu Mine, Abay Province — Ore, recoverable, Cu content; 6000 metric tons. listed, not named.
No stated operator
Nurkazgan (Samarskoye) Mine, Qaraghandy Province — Ore, recoverable, Cu content; 28000 metric tons. listed, not named.
No stated operator
Khadzhikongan Mine, Qaraghandy Province — Ore, recoverable, Cu content; 3000 metric tons. listed, not named.
No stated operator
Aktogay Mine, Abay Province — Ore, recoverable, Cu content; 203000 metric tons. counted as named.
Operator: KAZ Minerals Ltd.
Bozshakol Mine, Pavlodar Province — Ore, recoverable, Cu content; 102000 metric tons. counted as named.
Operator: KAZ Minerals Ltd.
East Region complex, Shyghys Qazaqstan Province: Artemyevskiy, Irtyshskiy, and Orlovsky Mines — Ore, recoverable, Cu content; no capacity printed. not added: no capacity printed (NA).
Operator: KAZ Minerals Ltd.
Kundyzdy Mine, Aqtobe Province — Ore, recoverable, Cu content; 11300 metric tons. counted as named.
Operator: Kazgeorud LLP
Ridder GOK,2 Shyghys Qazaqstan Province: Ridder-Sokolny Mine4 — Ore, recoverable, Cu content; NA metric tons. not added: no capacity printed (NA).
Operator: Kazzinc Ltd.
Shubinsky Mine5 — Ore, recoverable, Cu content; 2800 metric tons. counted as named.
Operator: Kazzinc Ltd.
Tishinsky Mine — Ore, recoverable, Cu content; 15000 metric tons. counted as named.
Operator: Kazzinc Ltd.
Maleevsky Mine in Altay GOK,2 Shyghys Qazaqstan Province — Ore, recoverable, Cu content; 40000 metric tons. counted as named.
Operator: Kazzinc Ltd.
PO Balkhashtsvetmet, Qaraghandy Province — In tailings from copper ore; NA metric tons. not compared: the row does not say whether it counts metal content or gross tonnage.
Operator: Kazakhmys Smelting LLP
AntimonyCannot be computed: no row measures what the national figure measures (antimony content, mined): the row does not say whether it counts metal content or gross tonnage
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 1 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of antimony from this country is held yet.
Lead plant, Ust-Kamenogorsk metallurgical — Antimony, mine, concentrate,; 700 metric tons. not compared: the row does not say whether it counts metal content or gross tonnage.
No stated operator
GoldCannot be computed: the 2023 facility table lists no gold facility
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 0 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of gold from this country is held yet.
NickelCannot be computed: no row measures what the national figure measures (nickel content, mined): the row does not say whether it counts metal content or gross tonnage
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 1 rows name an operator; 1 of 1 named operators have a stated owner. Flows: no stated ships_to flow of nickel from this country is held yet.
Balasauskandyk processing plant, Turkistan Province — Nickel, concentrate; 60 metric tons. not compared: the row does not say whether it counts metal content or gross tonnage.
Operator: Balausa Firm LLP
PhosphatesCannot be computed: the 2023 facility table lists no phosphates facility
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 0 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of phosphates from this country is held yet.
Rare earthsCannot be computed: no row measures what the national figure measures (rare earths mined, as rare-earth-oxide equivalent): printed as "rare earth elements, recovered from uranium-ore residue", not rare earths mined, as rare-earth-oxide equivalent
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 1 rows name an operator; 1 of 1 named operators have a stated owner. Flows: no stated ships_to flow of rare-earths from this country is held yet.
Plant in Stepnogorsk, Aqmola Province — Rare earth elements, recovered from uranium-ore residue; 1500 metric tons. not compared: printed as "rare earth elements, recovered from uranium-ore residue", not rare earths mined, as rare-earth-oxide equivalent.
Operator: Summit Atom Rare Earth Co. LLP
Silicon metalCannot be computed: no national series is matched to facility rows for silicon metal yet
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 4 of 4 rows name an operator; 2 of 4 named operators have a stated owner. Flows: no stated ships_to flow of silicon from this country is held yet.
SilverCannot be computed: the 2023 facility table lists no silver facility
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 0 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of silver from this country is held yet.
TungstenCannot be computed: the 2023 facility table lists no tungsten facility
Facilities: USGS Minerals Yearbook 2023, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 0 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of tungsten from this country is held yet.
Derived and lead relations are never counted here. How the ratio is computed
Discussion
Comments use threadkit (permission is participation). Sign in with OrangeCat to write. Fact-check is the same assistant as Ask, grounded in the corpus.
Loading comments…