6.6% of world uranium (mine production, 2024); 11 export measures.

  • extraction
  • research

Shares and ranks computed from USGS, EIA and WNA tables; rules from the policy register; measures from the OECD inventory. On the map →

Uzbekistan at a glance
FigureValueNote
In world uranium5th6.6% of world output, 2024
Companies here0none recorded yet
Rules it sets0policy instruments on record
Events1newest 2025-03-13

01What it produces

7 tables, USGS, EIA and WNA
Share of world output on the country’s leading production series for each resource, each bar drawn against the whole world, computed from the USGS, EIA and WNA tables; the rank beside each name is among countries the table lists individually.
Share of world output on the country’s leading production series for each resource, each bar drawn against the whole world, computed from the USGS, EIA and WNA tables; the rank beside each name is among countries the table lists individually.
RowValue (% of world)ShareNote
Uranium · 5th6.65th in the world, mine production, 2024
Gold · 8th3.98th in the world, mine production, 2025

Also produces, small shares: natural gas 1.1% · 17th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), phosphates 0.4% · 22nd (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), hydropower 0.2% · 57th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), coal <0.1% · 32nd (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.), oil <0.1% · 59th (Computed: Position of a country when the countries USGS lists individually are sorted by the same column, largest first; equal values share a rank.).

02Where it restricts, and is restricted

11 export measures

Exports it restricts

SourcedOECD Inventory of Export Restrictions on Critical Raw Materials (2024 data)Open the source → measures on 10 resources; open a row for what each measure does.

Sanctions that name it

No EU regime and no OFAC country program. Thematic lists can still name its people and companies.

Export measures: OECD Inventory of Export Restrictions on Critical Raw Materials (2024 data), read 2026-09-25. Sanctions read 2026-11-28 from the EU Sanctions Map and OFAC’s program list; a regime targets what its measures name, not the whole country.

03What has happened

1 dated
  1. 2025-03-13
    LoosensCapacityUZ

    Navoiuran, Orano and Itochu sign agreement to start Jongeldi uranium production

    Uranium conversion and enrichment

    gov.uz ↗official source

    The sentence that says so

    “The agreement provides for the start of uranium production by the end of 2025 at the Jongeldi deposit, located in the Tomdi district of Navoi region, as well as the intensification of geological exploration works within the framework of other joint projects.”

All events →

04What we know, and what is missing

2 full · 2 thin · 3 empty, counted from stated rows
  • Endowment and output

    7 resources measured in USGS, EIA or WNA tables.

    Full
  • Facilities

    6 rows in the USGS Minerals Yearbook chapter (2022). Full needs at least 10 stated facility rows.

    Thin
  • Companies

    6 operators named by USGS; 0 directory companies.

    Full
  • Law and licensing

    0 instruments it issues (0 on licensing); 11 OECD export measures. Full needs at least 3 stated rules on record, including how it licenses extraction or processing (a licence regime, permit or procedure).

    Thin
  • Trade

    no source in the repository yet. Full needs at least 3 stated named counterparties.

    Empty
  • Events

    1 accepted events in its jurisdiction. Full needs at least 5 stated dated events.

    Empty
  • People and labs

    0 labs in the register. Full needs at least 3 stated labs or people.

    Empty

Only stated rows count; candidate rows and rows worked out by a rule are shown elsewhere and never fill a box. How each box is computed · Send a source for an empty box →

05How complete is this picture

1 of 7 computed · named capacity / national production, stated rows only

For each resource: the capacity of facilities with a named operator, over the national production figure. Open a row for the working. Capacity is what the named plants can produce, not what they produced: plants run below capacity, so this can pass 100% and is not a share of output. No source here states production per facility, so "named operators made X% of output" is not claimed.

  • Uraniumnamed capacity / national production · uranium (U) content, mined90%

    3,600 tonnes named ÷ 4,000 tonnes national = 90.0% (exact). All rows of this basis, named or not: 3,600 tonnes (1 row). The facility table is for 2022 and the national figure for 2023: 1 year apart.

    National figure: WNA, Production from mines (tonnes U) ↗ — Mine production, 2023: “4000” (tonnes U (uranium metal content); identified resources are tonnes U recoverable to $130/kgU as of 1 January 2025, estimated).

    Facilities: USGS Minerals Yearbook 2022, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 1 rows name an operator; 1 of 1 named operators have a stated owner. Flows: no stated ships_to flow of uranium from this country is held yet.

    • Navoi (GMZ–1) — Uranium, U content; 3600 metric tons. counted as named.

      Operator: State Enterprise Navoiyuran

  • CopperCannot be computed: USGS lists no copper content, mined figure for this countryn/a

    Facilities: USGS Minerals Yearbook 2022, Table 2. Structure of the mineral industry (Table 2) ↗. 1 of 2 rows name an operator; 0 of 1 named operators have a stated owner. Flows: no stated ships_to flow of copper from this country is held yet.

    • Dal'neye (Yoshlik), Kalmakyr, and Sary-Cheku Mines, Toshkent Viloyati — Mine, Cu content; 150000 metric tons. counted as named.

      Operator: AO Almalyk mining and metallurgical complex

    • Qashqadaryo Viloyati — Concentrates,; NA metric tons. not compared: the row does not say whether it counts metal content or gross tonnage.

      No stated operator

  • GoldCannot be computed: the 2022 facility table lists no gold facilityn/a

    Facilities: USGS Minerals Yearbook 2022, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 0 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of gold from this country is held yet.

  • GraphiteCannot be computed: no national series is matched to facility rows for graphite yetn/a

    Facilities: USGS Minerals Yearbook 2022, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 1 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of graphite from this country is held yet.

  • Iron oreCannot be computed: no row measures what the national figure measures (usable iron ore, gross weight): printed as "iron ore", not usable iron ore, gross weightn/a

    Facilities: USGS Minerals Yearbook 2022, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 1 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of iron from this country is held yet.

    • Toshkent Viloyati — Iron ore; NA metric tons. not compared: printed as "iron ore", not usable iron ore, gross weight.

      No stated operator

  • LithiumCannot be computed: no row measures what the national figure measures (lithium content, mined): the row does not say whether it counts metal content or gross tonnagen/a

    Facilities: USGS Minerals Yearbook 2022, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 1 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of lithium from this country is held yet.

    • Toshkent Viloyati — Cesium, lithium, rubidium; NA metric tons. not compared: the row does not say whether it counts metal content or gross tonnage.

      No stated operator

  • PhosphatesCannot be computed: the 2022 facility table lists no phosphates facilityn/a

    Facilities: USGS Minerals Yearbook 2022, Table 2. Structure of the mineral industry (Table 2) ↗. 0 of 0 rows name an operator; 0 of 0 named operators have a stated owner. Flows: no stated ships_to flow of phosphates from this country is held yet.

Derived and lead relations are never counted here. How the ratio is computed