Power and grid engineering
Engineers who design, study and connect generation, transformers and the grid.
Work on this bottleneck
How this is computedA posting is filed under a bottleneck when its title names one of that bottleneck’s terms, or its description names them at least twice (title only for software and business roles); its role family is the first family whose title terms its title names.Method →Code → open roles filed here · Why it binds, and who holds it
The administrative line to be connected to the electricity grid. In several markets it is the slowest step in building anything.
Judged by Substrata, open to challenge · 2026-09-24 · not reviewed by anyone who hires for it
Engineers who design, study and connect generation, transformers and the grid.
Licensed trades who wire plants, substations and the lines between them.
High-voltage cable and switchgearLarge power transformer slotsGrid interconnection queues
Large power transformer slotsHeavy-duty gas turbine order booksGrid interconnection queues
Heavy-duty gas turbine order booksGrid interconnection queues
High-voltage cable and switchgearTwo-phase dielectric immersion coolantGrid interconnection queues
Heavy-duty gas turbine order booksGrid interconnection queues
Counted across the open roles above, by a published list of terms
| Named in postings | Kind | Postings | Share |
|---|---|---|---|
| Power-system studies (PSS/E, ETAP, PSCAD) | Skill | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| Bachelor’s degree asked | Credential | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| High-voltage work | Skill | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| NFPA 70E / arc-flash | Credential | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| Professional Engineer (PE) | Credential | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| Protection and relays | Skill | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| FMEA / root-cause analysis | Skill | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| PLC and industrial controls | Skill | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| Schematics and electrical troubleshooting | Skill | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| MATLAB / LabVIEW | Skill | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| CAD (SolidWorks, AutoCAD, Creo, NX) | Skill | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| Commercial driving licence | Credential | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| Electrical licence / journeyman card | Credential | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| Lean / Six Sigma | Credential | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| OSHA 10 / 30 | Credential | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
| Pneumatics and hydraulics | Skill | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → | How this is computedFor each skill or credential in the published list, the number of open postings whose title or description names any of its terms.Method →Code → |
What O*NET and ESCO say the work is and needs
O*NET 17-2071.00 · ISCO 2151.1.5
Research, design, develop, test, or supervise the manufacturing and installation of electrical equipment, components, or systems for commercial, industrial, military, or scientific use.
Job Zone Four: Considerable Preparation Needed. Most of these occupations require a four-year bachelor's degree, but some do not.
Core tasks
Most important knowledge
Essential skills in ESCO: power distribution engineer
O*NET 31.0 Database (US Department of Labor, CC BY 4.0) · ESCO API, European Commission
O*NET 51-8012.00 · ISCO 2151.1.6
Coordinate, regulate, or distribute electricity or steam.
Job Zone Three: Medium Preparation Needed. Most occupations in this zone require training in vocational schools, related on-the-job experience, or an associate's degree.
Core tasks
Most important knowledge
Essential skills in ESCO: substation engineer
O*NET 31.0 Database (US Department of Labor, CC BY 4.0) · ESCO API, European Commission
What O*NET and ESCO say the work is and needs
O*NET 47-2111.00 · ISCO 7411.1.1.2
Install, maintain, and repair electrical wiring, equipment, and fixtures. Ensure that work is in accordance with relevant codes. May install or service street lights, intercom systems, or electrical control systems.
Job Zone Three: Medium Preparation Needed. Most occupations in this zone require training in vocational schools, related on-the-job experience, or an associate's degree.
Core tasks
Most important knowledge
Essential skills in ESCO: industrial electrician
O*NET 31.0 Database (US Department of Labor, CC BY 4.0) · ESCO API, European Commission
O*NET 49-9051.00 · ISCO 7413.1.2
Install or repair cables or wires used in electrical power or distribution systems. May erect poles and light or heavy duty transmission towers.
Job Zone 1-2: Very Little to Some Preparation Needed. Usually requires a high school diploma or GED, though some occupations may not.
Core tasks
Most important knowledge
Essential skills in ESCO: overhead line worker
O*NET 31.0 Database (US Department of Labor, CC BY 4.0) · ESCO API, European Commission
O*NET 49-2095.00
Inspect, test, repair, or maintain electrical equipment in generating stations, substations, and in-service relays.
Job Zone Three: Medium Preparation Needed. Most occupations in this zone require training in vocational schools, related on-the-job experience, or an associate's degree.
Core tasks
Most important knowledge
O*NET 31.0 Database (US Department of Labor, CC BY 4.0)
Public programmes for these role families, each on its official page
Apprenticeship · United States
electrical training ALLIANCE (IBEW & NECA)
On-the-job training plus classroom training; apply to local JATC
Union apprenticeships for outside linemen (transmission/distribution lines) and inside wiremen (power, controls in commercial/industrial buildings).
Official page checked 2026-09-24. Listed, not reviewed or endorsed.
College · United States
Northwest Lineman College
15-week pre-apprentice program; Class A CDL required
Climbing, overhead and underground distribution, transmission, equipment, CDL and crane training at campuses in ID, CA, TX and FL.
Official page checked 2026-09-24. Listed, not reviewed or endorsed.
College · United States
Forsyth Technical Community College
8 weeks; 18+, high school diploma/GED, valid driver's license; mandatory 4-hour orientation
Trains entry-level line workers for public and private utilities: pole climbing, bucket trucks, power line installation and repair.
Official page checked 2026-09-24. Listed, not reviewed or endorsed.
College · United States
Mott Community College / Consumers Energy
10-week MCC core curriculum + 11-week Climb School
Pre-apprenticeship pathway to Consumers Energy lineworker roles (completion does not guarantee employment).
Official page checked 2026-09-24. Listed, not reviewed or endorsed.
Apprenticeship · United States
Texas A&M Engineering Extension Service (TEEX)
4-year program, 96 hours per year over three non-consecutive weeks
Related instruction for DOL lineworker apprenticeships; participants must be affiliated with an electric company, cooperative or contractor.
Official page checked 2026-09-24. Listed, not reviewed or endorsed.
Apprenticeship · United Kingdom
Skills England
Level 3; typically 30-36 months
National standard for overhead linesperson, underground cable jointer and substation fitter apprenticeships run by UK network operators.
Official page checked 2026-09-24. Listed, not reviewed or endorsed.
University · United States
Worcester Polytechnic Institute
Online, 30 graduate credit hours
Prepares electrical engineers for utility practice; engineers from other disciplines may succeed with AC circuits and maths background.
Official page checked 2026-09-24. Listed, not reviewed or endorsed.
University · United Kingdom
The University of Manchester
12 months full-time, in person
Power systems and high-voltage engineering MSc using Manchester's High Voltage Lab.
Official page checked 2026-09-24. Listed, not reviewed or endorsed.
University · Netherlands
Delft University of Technology
120 EC, 24 months
Track covering power grids, power conversion and high voltage for the energy transition.
Official page checked 2026-09-24. Listed, not reviewed or endorsed.
Public programme · Japan · open to career changers
JEED (Japan Organization for Employment of the Elderly, Persons with Disabilities and Job Seekers)
Public vocational training for job seekers and in-service workers
National public training centres focused on manufacturing (machinery, electrical, electronics) to support re-employment.
Official page checked 2026-09-24. Listed, not reviewed or endorsed.
Apprenticeship · United Kingdom
Amazon (AWS) UK
36 months, 40-hour week; Level 4 (Electrical Power Protection and Plant Commissioning Engineer); 18+, STEM A Level/BTEC or Level 3 apprenticeship
Blended-learning apprenticeship testing and maintaining the electrical power systems that run AWS data centres.
Official page checked 2026-09-24. Listed, not reviewed or endorsed.