Electronic-grade polysilicon

Silicon purified to eleven nines, the raw material every silicon wafer starts from.

Searching is free and needs no AI. Summaries use your own AI model.

Severity
How this is computedSum of four judged scores, each 0–3: concentration + substitution + lead time + inelasticity.Method →Code →
How hard it binds, 0 to 12
When it bites
Later
judged 2026-09-15
Evidence
Verified
5 maker rows

01Key numbers

dated, each linked to its source

Every series on every bottleneck — filter, compare and download.

02Why it holds things up

Solar-grade polysilicon has many producers; electronic-grade has very few, and the gap between the two is measured in orders of magnitude of impurity, not in price.

Grade that ships · 11N (99.999999999%) polysilicon chunk or rod, Siemens process.

Part of the process · Materials & tools, which takes years, per qualification to loosen once somebody decides to.

03Severity

judged 2026-09-15 · a judgement, not a measurement

How this is computedSum of four judged scores, each 0–3: concentration + substitution + lead time + inelasticity.Method →Code → / 12

How few suppliers qualify
Estimate, not a measurementFive producers at eleven nines; capacity is being added (Tokuyama Vietnam, OCI). Not binding, and the loosening events say so.By Substrata, open to challenge · 2026-09-15 / 3
How hard to replace
Estimate, not a measurementFive producers at eleven nines; capacity is being added (Tokuyama Vietnam, OCI). Not binding, and the loosening events say so.By Substrata, open to challenge · 2026-09-15 / 3
Decision to new capacity
Estimate, not a measurementFive producers at eleven nines; capacity is being added (Tokuyama Vietnam, OCI). Not binding, and the loosening events say so.By Substrata, open to challenge · 2026-09-15 / 3
Can the buyer walk away
Estimate, not a measurementFive producers at eleven nines; capacity is being added (Tokuyama Vietnam, OCI). Not binding, and the loosening events say so.By Substrata, open to challenge · 2026-09-15 / 3

Five producers at eleven nines; capacity is being added (Tokuyama Vietnam, OCI). Not binding, and the loosening events say so.

04Who makes it

5 verified of 5 rows

05What it rests on, and what rests on it

each row quotes the page it rests on

Depended on by

A recorded dependency is a sentence, not a share, a volume or a contract. Walk it on a portfolio →

06Rules that govern it

All policy →

07What would remove it

No candidate relief has been written up for this one yet.

08Science pipeline

10 papers, preprints and grants collected, unreviewed
  1. Research10 (Computed: Items per stage = papers, preprints and grants collected for the bottleneck whose relevance score is 2 or more, placed on a stage by the rule in lib/science.ts; judgements are counted separately.)
  2. Lab0 (Computed: Items per stage = papers, preprints and grants collected for the bottleneck whose relevance score is 2 or more, placed on a stage by the rule in lib/science.ts; judgements are counted separately.)
  3. Pilot0 (Computed: Items per stage = papers, preprints and grants collected for the bottleneck whose relevance score is 2 or more, placed on a stage by the rule in lib/science.ts; judgements are counted separately.)
  4. Early0 (Computed: Items per stage = papers, preprints and grants collected for the bottleneck whose relevance score is 2 or more, placed on a stage by the rule in lib/science.ts; judgements are counted separately.)
  5. Scale0 (Computed: Items per stage = papers, preprints and grants collected for the bottleneck whose relevance score is 2 or more, placed on a stage by the rule in lib/science.ts; judgements are counted separately.)

judged, with a citation claimed, no citationNumber: papers, preprints and grants the feeds collected — unreviewed

The full pipeline, by stage →

09What we have predicted

  • 2026-09-15open until 2029-06-30

    The US Section 232 action on polysilicon will not add qualified electronic-grade capacity in the United States before 2029, whatever it does to solar-grade supply.

    Settled by · Any announcement by a producer of new US electronic-grade (eleven-nines) polysilicon capacity qualified and shipping to a semiconductor customer before 2029 would settle this against the call.

All calls →

10Who could fund relief

Is funding the constraint? · Money is not the constraint

A US plant is at risk of closing because a trade measure drove its customers away. Capacity is not short of funding; it is short of buyers.

  • Japan’s policy-based financial institution: lending, investment and guarantees that sit beside private banks rather than instead of them.

    Export credit will not fund · A project with no domestic content. The money follows the exporter, not the need, which is why it can build a plant on one continent and never on another.

A mandate covering the kind of asset that would relieve this row. Not a claim that anyone has funded one, and not advice.

11What has happened

3 dated
  1. 2026-09-05
    TightensCapacityUS DE

    Wacker’s 600-worker Charleston polysilicon plant may close after a US trade measure drove off both its customers.

    WhoWacker Chemie

    arkansasonline.com ↗secondary source

    The sentence that says so

    “The move follows a White House proclamation last month that seeks to incentivize purchases of American polysilicon, the sources said, declining to be named because the matter was not public.”

  2. 2026-08-27
    LoosensCapacityVN JP

    Tokuyama opens a polysilicon factory in Vietnam.

    WhoTokuyama

    pv-magazine-india.com ↗official source

    The sentence that says so

    “Japan's Tokuyama opens polysilicon factory in Vietnam.”

  3. 2026-07-28
    LoosensCapacityKR MY US

    OCI Holdings plans to double polysilicon production capacity by 2029 to meet US demand.

    WhoOCI

    pv-magazine.com ↗official source

    The sentence that says so

    “OCI Holdings plans to double polysilicon production capacity by 2029.”

All events →

12What this holds up

2 loops
  • Siliconone turn: Months

    Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15

  • Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15

A loop is one design, build and measure turn. Severity is a dated judgement on a 0–12 scale, not a measurement, and the judgements are not added together — the figure shown is the worst single one.