Sets the export rules most of the chip chain is written against.

6 rules tracked · How this is computedRules counted by the effect recorded on each: "tightens" slows building, "loosens" speeds it; a rule recorded as both ways is counted in neither.Method →Code → slow building · How this is computedRules counted by the effect recorded on each: "tightens" slows building, "loosens" speeds it; a rule recorded as both ways is counted in neither.Method →Code → speed it · How this is computedRules counted by the effect recorded on each: "tightens" slows building, "loosens" speeds it; a rule recorded as both ways is counted in neither.Method →Code → both ways

01Rules tracked here

02What we would change here

This project's own view
  • Decided by Federal Energy Regulatory Commission and state regulators

    Standardise large power transformer specifications across utilities so orders are interchangeable rather than bespoke.

    A large share of the lead time is that almost every transformer is custom, which stops manufacturers from building to stock and makes a cancelled order worthless to the next buyer.

    Wrong if · Lead times staying above three years in markets that have standardised, which would mean the constraint is core steel and winding capacity rather than specification churn.