Process · TW KR US
Advanced packaging capacity
Assembling several chips into one AI accelerator. How many exist is set here, not at the wafer.
Searching is free and needs no AI. Summaries use your own AI model.
01Key numbers
What the text on this page claims, and the number behind it
Capacity is allocated ahead and demand has still run past it
Measured"Allocated years ahead" had no source; a supply–demand gap reported for CoWoS does.
TSMC CoWoS monthly capacity (reported): Source: TrendForce News (citing Economic Daily News / industry estimates)SourcedTrendForce News (citing Economic Daily News / industry estimates)Open the source → wafers/month, Dec 2025CoWoS supply-demand gap: Source: TrendForce News (citing Taiwanese press)SourcedTrendForce News (citing Taiwanese press)Open the source → %, Dec 2026
Capacity · company: TSMCTSMC CoWoS monthly capacity (reported)Source: TrendForce News (citing Economic Daily News / industry estimates) (Dec 2025)SourcedTrendForce News (citing Economic Daily News / industry estimates) · Dec 2025Open the source → wafers/monthDec 202535,000 (2024) → 75,000 (Dec 2025).How this is computedThe latest value in a series minus the value before it, divided by the earlier value, same series and unit.35,000 (2024) → 75,000 (Dec 2025).Method →Code → vs 2024 · loosens
TSMC does not publish CoWoS capacity; these are press estimates, labelled by when they were made.
TSMC CoWoS monthly capacity (reported), wafers/month, 2024 to Dec 2025. Every value is listed in the table below. Period Value Source Dec 2025 Source: TrendForce News (citing Economic Daily News / industry estimates) (2025-12-08)SourcedTrendForce News (citing Economic Daily News / industry estimates) · 2025-12-08Open the source → wafers/month TrendForce News (citing Economic Daily News / industry estimates) ↗ secondary report TSMC aims to scale monthly CoWoS capacity from today’s 75,000–80,000 wafers to as high as 120,000–130,000.
Range 75,000-80,000; low end recorded2024 Source: TrendForce News (citing Taiwanese press / institutional investors) (2024-12-13)SourcedTrendForce News (citing Taiwanese press / institutional investors) · 2024-12-13Open the source → wafers/month TrendForce News (citing Taiwanese press / institutional investors) ↗ secondary report TSMC’s monthly CoWoS production capacity reaches 35,000 wafers this year, contributing approximately 7%–9% of the company’s total revenue.
Press estimate, not a TSMC disclosureRead from the sources Read from the source by an agent; quote matched mechanically against the fetched page; not yet reviewed by a person, 2026-09-24. Each value links the page it came from and quotes the sentence that carries it.
Other · WorldCoWoS supply-demand gapSource: TrendForce News (citing Taiwanese press) (Dec 2026)SourcedTrendForce News (citing Taiwanese press) · Dec 2026Open the source → %Dec 2026 · target or forecast20 (Jun 2026) → 10 (Dec 2026).How this is computedThe latest value in a series minus the value before it, divided by the earlier value, same series and unit.20 (Jun 2026) → 10 (Dec 2026).Method →Code → vs Jun 2026
CoWoS supply-demand gap, %, Jun 2026 to Dec 2026. Every value is listed in the table below. Period Value Source Dec 2026 Source: TrendForce News (citing Taiwanese press) (2026-06-15)SourcedTrendForce News (citing Taiwanese press) · 2026-06-15Open the source → % target or forecast TrendForce News (citing Taiwanese press) ↗ secondary report the CoWoS supply-demand gap is expected to narrow significantly from around 20% currently to about 10% by the end of 2026
ProjectionJun 2026 Source: TrendForce News (citing Taiwanese press) (2026-06-15)SourcedTrendForce News (citing Taiwanese press) · 2026-06-15Open the source → % TrendForce News (citing Taiwanese press) ↗ secondary report the CoWoS supply-demand gap is expected to narrow significantly from around 20% currently to about 10% by the end of 2026
Shortfall of supply vs demand, approximateRead from the sources Read from the source by an agent; quote matched mechanically against the fetched page; not yet reviewed by a person, 2026-09-24. Each value links the page it came from and quotes the sentence that carries it.
Capacity · company: TSMCTSMC CoWoS monthly capacity (projection)Source: TrendForce News (citing Taiwanese press / institutional investors) (Dec 2026)SourcedTrendForce News (citing Taiwanese press / institutional investors) · Dec 2026Open the source → wafers/monthDec 2026 · target or forecast70,000 (Dec 2025) → 90,000 (Dec 2026).How this is computedThe latest value in a series minus the value before it, divided by the earlier value, same series and unit.70,000 (Dec 2025) → 90,000 (Dec 2026).Method →Code → vs Dec 2025
TSMC does not publish CoWoS capacity; these are press estimates, labelled by when they were made.
TSMC CoWoS monthly capacity (projection), wafers/month, 2025 to Dec 2026. Every value is listed in the table below. Period Value Source Dec 2026 Source: TrendForce News (citing Taiwanese press / institutional investors) (2024-12-13)SourcedTrendForce News (citing Taiwanese press / institutional investors) · 2024-12-13Open the source → wafers/month target or forecast TrendForce News (citing Taiwanese press / institutional investors) ↗ secondary report By the end of 2026, capacity is expected to grow further to 90,000 wafers per month.
Projection made Dec 2024; superseded by higher Dec 2025 estimateDec 2025 Source: TrendForce News (citing Taiwanese press / institutional investors) (2024-12-13)SourcedTrendForce News (citing Taiwanese press / institutional investors) · 2024-12-13Open the source → wafers/month TrendForce News (citing Taiwanese press / institutional investors) ↗ secondary report By the end of 2025, its monthly CoWoS capacity is projected to reach 70,000 wafers, with its revenue contribution surpassing 10%.
Projection made Dec 20242025 Source: TrendForce News (citing Taiwanese press) (2025-01-02)SourcedTrendForce News (citing Taiwanese press) · 2025-01-02Open the source → wafers/month TrendForce News (citing Taiwanese press) ↗ secondary report TSMC’s CoWoS monthly capacity could reach a record high of 75,000 wafers in 2025—nearly doubling 2024 levels.
Projection made Jan 2025Read from the sources Read from the source by an agent; quote matched mechanically against the fetched page; not yet reviewed by a person, 2026-09-24. Each value links the page it came from and quotes the sentence that carries it.
Other · company: TSMCTSMC advanced packaging share of revenueSource: TSMC 4Q25 earnings call transcript (2025)SourcedTSMC 4Q25 earnings call transcript · 2025Open the source → %20258 (2024) → 10 (2025).How this is computedThe latest value in a series minus the value before it, divided by the earlier value, same series and unit.8 (2024) → 10 (2025).Method →Code → vs 2024
TSMC advanced packaging share of revenue, %, 2024 to 2025. Every value is listed in the table below. Period Value Source 2025 Source: TSMC 4Q25 earnings call transcript (2026-01-15)SourcedTSMC 4Q25 earnings call transcript · 2026-01-15Open the source → % TSMC 4Q25 earnings call transcript ↗ primary the revenue contribution last year from advanced packaging is slightly over 10% (corrected by company after the call). It's about 8% in 2024.
Stated as "slightly over 10%"2024 Source: TSMC 4Q25 earnings call transcript (2026-01-15)SourcedTSMC 4Q25 earnings call transcript · 2026-01-15Open the source → % TSMC 4Q25 earnings call transcript ↗ primary the revenue contribution last year from advanced packaging is slightly over 10% (corrected by company after the call). It's about 8% in 2024.
Stated as "about 8%"Read from the sources Read from the source by an agent; quote matched mechanically against the fetched page; not yet reviewed by a person, 2026-09-24. Each value links the page it came from and quotes the sentence that carries it.
Capacity · company: TSMCTSMC capex share for advanced packaging, masks and othersSource: TSMC 4Q25 earnings call transcript (2026)SourcedTSMC 4Q25 earnings call transcript · 2026Open the source → %2026
Period Value Source 2026 Source: TSMC 4Q25 earnings call transcript (2026-01-15)SourcedTSMC 4Q25 earnings call transcript · 2026-01-15Open the source → % TSMC 4Q25 earnings call transcript ↗ primary about 10 to 20 percent will be spent for advanced packaging, testing, mask making and others
Range 10-20% of 2026 capital budget; recorded upper boundRead from the sources Read from the source by an agent; quote matched mechanically against the fetched page; not yet reviewed by a person, 2026-09-24. Each value links the page it came from and quotes the sentence that carries it.
Capacity · company: TSMCTSMC planned CoWoS capacity expansion by 2027Source: TrendForce press release (2027)SourcedTrendForce press release · 2027Open the source → %2027 · target or forecast
Period Value Source 2027 Source: TrendForce press release (2026-04-30)SourcedTrendForce press release · 2026-04-30Open the source → % target or forecast TrendForce press release ↗ primary aided by order spillover and TSMC’s plan to expand CoWoS capacity by over 60% by 2027
TrendForce own research press release; ">60%"; baseline year not specified in the sentenceRead from the sources Read from the source by an agent; quote matched mechanically against the fetched page; not yet reviewed by a person, 2026-09-24. Each value links the page it came from and quotes the sentence that carries it.
Every series on every bottleneck — filter, compare and download.
02Why it holds things up
Accelerator output is gated by how many dies can be packaged onto an interposer, not by wafer starts. Capacity is allocated ahead and demand has still run past it, which makes the allocation itself the scarce good.
Part of the process · Compute, which takes quarters to years to loosen once somebody decides to.
03Severity
How this is computedSum of four judged scores, each 0–3: concentration + substitution + lead time + inelasticity.Method →Code → / 12
Accelerator output is set by CoWoS-class capacity, allocated ahead and still short of demand. The allocation is the scarce good.
04Who makes it
| Organisation | Step | Evidence | |
|---|---|---|---|
| TSMC Advanced Packaging2330 TTvia TSMC | TW | Runs the capacity | Verified source ↗ |
05What it rests on, and what rests on it
Depends on
- Leading-edge foundry capacity
“so that various chiplets such as SoC and and high bandwidth memory (HBM) can be placed on it”
investor.tsmc.com · primary source · TSMC’s 2022 annual report on the CoWoS interposer. The SoC dies are the logic side.
- High-bandwidth memory stacking yield
“so that various chiplets such as SoC and and high bandwidth memory (HBM) can be placed on it”
investor.tsmc.com · primary source
Depended on by
Sold into by
- KLA
“Increasing complexity and value of semiconductor packages, particularly for AI and HPC applications, is also driving significant growth in our advanced packaging business.”
sec.gov · primary source · KLA’s own advanced packaging business.
- Tokyo Electron
“In the backend process, we also possess wafer probers used in wafer testing and bonding/ debonding systems that realize 3D packaging.”
tel.com · primary source · A product line (as extracted from the PDF), not a named customer.
- Canon
“unit sales of Canon’s advanced back-end lithography systems, which have become the industry standard, exceeded those of the previous year.”
global.canon · primary source · Annual Report 2025. Back-end lithography is packaging; customers are not named.
A recorded dependency is a sentence, not a share, a volume or a contract. Walk it on a portfolio →
06Rules that govern it
Foreign-produced direct product rule additions, including controls on high-bandwidth memory
Brought the memory stacks that feed AI accelerators inside the export-control perimeter.
07What would remove it
- Hybrid bondingEstimate by Substrata, open to challenge, 2026-09-15: In production for some image sensors and logic stacks; ramping for memory stacks.Estimate, not a measurementIn production for some image sensors and logic stacks; ramping for memory stacks.By Substrata, open to challenge · 2026-09-15Supporting source → · Pilot running in the real environment
More function per package reduces how much packaging capacity a given amount of compute needs.
08Science pipeline
judged, with a citation claimed, no citationNumber: papers, preprints and grants the feeds collected — unreviewed
- Network-on-Chip Technology for Chiplet Integration Architecture
In today's era, the marginal benefits of transistor scaling are continuously decreasing, and Chiplet heterogeneous integration has become the mainstream path for scaling AI chip computing power. Meanwhile, on-chip interconnect performance is increasingly becoming the key factor…
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- MICROSOFT MAIA 300 // N2P MULTI-CHIPLET // 288GB HBM4.
MICROSOFT MAIA 300 // N2P MULTI-CHIPLET // 288GB HBM4.
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Recent Advances in Performance-Driven Multiscale Strategies for Epoxy-Based Underfill Materials for Advanced Packaging
The rapid evolution of advanced packaging toward high-density, high-power, and three-dimensional heterogeneous integration has placed increasingly stringent demands on package reliability, particularly because of the thermal expansion mismatch and associated thermomechanical…
Key Laboratory of Functional Materials and Applications of Fujian ProvinceXiamen University of Technology
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOI
- Semantic D2D Gateway Firewalls for Multi-Tenant Chiplet NoC Resource Isolation
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
- A Bandwidth-Balanced Adaptive Technique for Mesh-Based I/O Chiplets
As the semiconductor industry rapidly embraces chiplet-based architectures to satisfy AI-driven high-performance computing demands, the flexible, scalable I/O‑Die (IOD) chiplet offers a promising path toward solving the AI memory wall. However, the design of these IOD chiplets…
American Rock Mechanics Association
Fundamental research · No laboratory or pilot wording.From OpenAlex · not yet reviewedDOIPDF
09What we have predicted
- 2026-09-15open until 2027-03-31
Through 2026, high-bandwidth memory supply rather than leading-edge wafer supply will be the stated limit on AI accelerator shipments.
Settled by · Earnings calls or guidance from an accelerator maker or a memory maker naming which of the two limited shipments during 2026.
10What has happened
- 2026-07-29NeutralMilestoneDE
SUSS plans a €45 million Advanced Packaging application and development center in Karlsruhe.
suss.com ↗official source
The sentence that says so
“SUSS, a leading manufacturer of equipment and process solutions for the semiconductor industry, plans to invest approximately €45 million in a new application and development center in Karlsruhe (Baden-Württemberg, Germany), significantly expanding its innovation capacities in Advanced Packaging.”
11What this holds up
- Software scaffoldone turn: Minutes
Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15
- Frontier training runone turn: Weeks to months
Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15
A loop is one design, build and measure turn. Severity is a dated judgement on a 0–12 scale, not a measurement, and the judgements are not added together — the figure shown is the worst single one.
Discussion
Comments use threadkit (permission is participation). Sign in with OrangeCat to write. Fact-check is the same assistant as Ask, grounded in the corpus.
- No comments yet.