Skip to content
Substrata
Join

Calls

Predictions with a date and with the observation that would settle them. This is the part of the research that can be wrong, which is the part worth judging it on.

Open
How this is computedOpen = calls without a resolution; resolved = right + wrong + unclear; overdue = past the resolve-by date and not yet marked; hit rate = right ÷ (right + wrong), published only once enough calls have resolved.Method →Code →
waiting on the world
Resolved
How this is computedOpen = calls without a resolution; resolved = right + wrong + unclear; overdue = past the resolve-by date and not yet marked; hit rate = right ÷ (right + wrong), published only once enough calls have resolved.Method →Code →
0 right · 0 wrong · 0 unclear
Overdue
How this is computedOpen = calls without a resolution; resolved = right + wrong + unclear; overdue = past the resolve-by date and not yet marked; hit rate = right ÷ (right + wrong), published only once enough calls have resolved.Method →Code →
nothing past its date
Hit rate
—
not published until 10 have resolved

How this is kept honest. A call is published with the date it was made and the observation that settles it, so it cannot be quietly reinterpreted later. Wrong calls stay on this page with the same weight as right ones. No hit rate is shown until 10 have resolved, because a percentage computed from a handful is noise wearing a number.

01Open

7, soonest to resolve first
  • 2026-09-15OpenTentativeresolves by 2027-03-31

    Through 2026, high-bandwidth memory supply rather than leading-edge wafer supply will be the stated limit on AI accelerator shipments.

    This is the clearest test of the claim that the bottleneck sits below where attention is. Coverage treats the foundry as the constraint; the memory stack and the packaging around it are where the recent allocation fights have actually been.

    What would settle it
    Earnings calls or guidance from an accelerator maker or a memory maker naming which of the two limited shipments during 2026.

    AboutHigh-bandwidth memory stacking yieldAdvanced packaging capacity

  • 2026-09-15OpenFirmresolves by 2028-01-31

    Large power transformer lead times will still be three years or longer at the end of 2027, despite the capacity expansions announced through 2026.

    The announced expansions add winding capacity, but the core steel behind them is made on a small number of qualified lines and a new mill takes years. Capital has been available for two years already without shortening the queue, which is the signal that the constraint is not capital.

    What would settle it
    Quoted lead times for a 100 MVA-class unit from at least two major manufacturers or a published industry survey, dated in the last quarter of 2027.

    AboutLarge power transformer slotsGrain-oriented electrical steel (GOES)

  • 2026-09-15OpenTentativeresolves by 2028-01-31

    Silicon carbide substrates will not become a binding constraint before 2028: no sustained shortage, and at least one more Western capacity retrenchment.

    Capacity was built for an automotive demand curve that did not arrive, and a US wafer subsidiary is already being wound up. This is deliberately a call against the site being interesting on this row, and it is the easiest of these to lose if datacentre power conversion moves faster than expected.

    What would settle it
    Absence of reported allocation or lead-time extension for 150 mm or 200 mm SiC substrates through 2027, plus at least one further announced closure, sale or capacity cut by a Western maker.

    AboutSilicon carbide substrate, 200 mm semi-insulating

  • 2026-09-15OpenTentativeresolves by 2028-01-31

    Neon will not see another supply squeeze of the 2022 kind before 2028, because on-site recycling has structurally cut what a fab needs.

    The 2022 shock triggered recycling and non-Ukrainian separation that did not exist before. If a shortage recurs anyway, then the substitution that was supposed to have relieved it did not, which is the more important finding.

    What would settle it
    Absence of a reported neon allocation, price spike above roughly three times the 2021 level, or fab output impact attributed to neon, through the end of 2027.

    AboutNeon, excimer laser grade

  • 2026-09-15OpenFirmresolves by 2028-03-31

    China will still require export licences for dysprosium and terbium at the end of 2027, and no non-Chinese source will supply more than a tenth of world heavy rare-earth separation capacity.

    The April 2025 controls made licensing a standing instrument rather than a one-off. Mining is spreading, but separation and metal-making are the concentrated steps and neither is quick to replicate, which is the part most coverage skips.

    What would settle it
    China's published control list as it stands at the end of 2027, plus capacity figures from a body such as the US Geological Survey or a named producer's own reporting.

    AboutDysprosium metalRare-earth magnet sintering

  • 2026-09-15OpenTentativeresolves by 2029-03-31

    Median US interconnection queue duration will not fall below three years by the end of 2028, even though FERC Order No. 2023 took effect in November 2023.

    The reform changes how the queue is processed, not how much transmission exists, and the backlog it inherited is larger than the annual study throughput. If a well-designed process reform cannot clear it, the constraint is physical rather than administrative — which is the more interesting outcome.

    What would settle it
    The Lawrence Berkeley National Laboratory queued-projects series, or an equivalent published dataset, reporting median duration from request to agreement for projects completing in 2028.

    AboutGrid interconnection queues

  • 2026-09-15OpenFirmresolves by 2029-06-30

    The US Section 232 action on polysilicon will not add qualified electronic-grade capacity in the United States before 2029, whatever it does to solar-grade supply.

    Electronic-grade polysilicon is a different product from solar-grade and is qualified per customer over years. A tariff changes the price of importing it; it does not shorten a qualification cycle, which is the thing that actually gates supply.

    What would settle it
    Any announcement by a producer of new US electronic-grade (eleven-nines) polysilicon capacity qualified and shipping to a semiconductor customer before 2029 would settle this against the call.

    AboutElectronic-grade polysilicon

02Resolved

0

Nothing has resolved yet.

The first of these comes due 2027-03-31.