Equipment & consumables · Japan
JSR
No listed share
Work there, own part of it, buy from it ↓
Photoresists. Holds 1 bottleneck outright; a constraint on 1 bottleneck on record.
- 0 of 33Exposed toholds 1 · who waits on it is not recorded
- 12 of 12Hardest bindingPhotoresist formulation · holds it
- ChokepointDirectory gradea judgement, not a sourced fact
- PrivateListingno listed shares
- 0Eventsnewest 2026-04-23 · 1 on what it holds
| Figure | Value | Note |
|---|---|---|
| Exposed to | 0 of 33 | holds 1 · who waits on it is not recorded |
| Hardest binding | 12 of 12 | Photoresist formulation · holds it |
| Directory grade | Chokepoint | a judgement, not a sourced fact |
| Listing | Private | no listed shares |
| Events | 0 | newest 2026-04-23 · 1 on what it holds |
Why graded so · Resist chemistry is qualified per process per fab; substituting one is a programme, not a purchase.
Role cited from jsr.co.jp ↗. The grade is this project’s judgement. Report an error
Searching is free and needs no AI. Summaries use your own AI model.
01Share price
Reading closing prices…
02Key statistics
Reading the filings…
03What constrains it
Nothing JSR depends on is recorded with a source yet: no sentence of its own, and no supplier named by a source.
Would be filled by: 10-K customers over 10% of revenue, 20-F related parties; offtake, royalty or supply agreement announced on an exchange feed; NI 43-101 or JORC report (mines); the counterparty’s own filing naming the company.
Send evidence about its suppliers04What it constrains
Holds Photoresist formulation · 12 of 12
Needed as an input by: Leading-edge foundry capacity (11).
One step further: 7 leads, not counted
- NVIDIAworked outNVIDIA needs Leading-edge foundry capacity, which needs Photoresist formulation, which JSR holds. · sec.gov ↗ · read 2026-09-24
- AMDworked outAMD needs Leading-edge foundry capacity, which needs Photoresist formulation, which JSR holds. · sec.gov ↗ · read 2026-09-24
- Broadcomworked outBroadcom needs Leading-edge foundry capacity, which needs Photoresist formulation, which JSR holds. · sec.gov ↗ · read 2026-09-24
- Microsoftworked outMicrosoft needs Leading-edge foundry capacity, which needs Photoresist formulation, which JSR holds. · blogs.microsoft.com ↗ · read 2026-09-25
All 7
- Amazon Web Servicesworked outAmazon Web Services needs Leading-edge foundry capacity, which needs Photoresist formulation, which JSR holds. · aboutamazon.com ↗ · read 2026-09-25
- CoreWeaveworked outCoreWeave needs Leading-edge foundry capacity, which needs Photoresist formulation, which JSR holds. · sec.gov ↗ · read 2026-09-25
- Marvellworked outMarvell needs Leading-edge foundry capacity, which needs Photoresist formulation, which JSR holds. · sec.gov ↗ · read 2026-09-25
No organisation is recorded as waiting on JSR: no customer names it, and it holds no chokepoint others are recorded to need.
Would be filled by: 10-K customers over 10% of revenue, 20-F related parties; offtake, royalty or supply agreement announced on an exchange feed; NI 43-101 or JORC report (mines); the counterparty’s own filing naming the company.
Send evidence about its customers05Revenue and net income by year
Reading the filings…
06Chokepoints it holds
- Photoresist formulation
Makes it · Within two years
Other makers: Tokyo Ohka Kogyo JP, Shin-Etsu Chemical JP
Score = concentration + substitution + lead time + inelasticity, each 0–3 · an analyst judgement dated 2026-09-15 · makers are those the corpus records, not the whole market
07Ownership and investors
Private — owned by Japan Investment Corporation, through JICC-02, since the 2024 tender offer and squeeze-out.
| Row | Share |
|---|---|
| JIC Capital (JICC-02) | 100% |
- JIC Capital (JICC-02)100%State · as of 2024-06-25 · jsr.co.jp ↗ · Delisted from the Tokyo Stock Exchange on 25 June 2024 after the squeeze-out that followed JICC-02’s tender offer; JIC is a Japanese government-backed fund.
Each figure is as of the date on its row, read from the document it links to: an annual report, a proxy statement, a regulatory notice or the company’s own investor page. A holder with no figure is named by a lead that nobody here has read against such a document. Shares shift daily; this is a record, not a feed. Correct a row
08How it does business
Customers — who buys from it
No customer of JSR is recorded as a named company with a source yet.
Would be filled by: 10-K customers over 10% of revenue, 20-F related parties; offtake, royalty or supply agreement announced on an exchange feed; NI 43-101 or JORC report (mines); the counterparty’s own filing naming the company.
Send evidence about its customersSuppliers — who it buys from
No supplier of JSR is recorded as a named company with a source yet.
Would be filled by: 10-K customers over 10% of revenue, 20-F related parties; offtake, royalty or supply agreement announced on an exchange feed; NI 43-101 or JORC report (mines); the counterparty’s own filing naming the company.
Send evidence about its suppliersCompetitors
No competitor of JSR is recorded as a named company with a source yet.
Would be filled by: 10-K Item 1 “Competition”, or a 20-F “Competitive landscape” section; an agency or market report naming the producers of one product.
Send evidence about its competitors09What has happened
About what it holds, not naming JSR
Japanese photoresist makers warn Samsung and SK hynix that the Iran war has cut supply of the solvents the chemistry needs. thelec.net ↗
10Unread leads
Photoresist Stripping System Market 2026-2032 openpr.com ↗
China Semiconductor Photoresist 2026 — A Five-Generation Climb from i-line, KrF, ArF to EUV faxiangongchang.com ↗
1. Wie ist ein Photoresist aufgebaut und wie funktioniert er? allresist.de ↗
All 5 leads
Pages the sweep found on these chokepoints. Nobody here has read them yet; they are not events and not evidence.
11What could loosen its grip
- Dry and metal-oxide photoresistsreadiness
A different chemistry for the light-sensitive layer on a wafer, deposited as a film rather than spun on as a liquid.
Science · for Photoresist formulation
Estimate by Substrata, 2026-09-15: Prototype at meaningful scale. Demonstrated on production-class tools and being qualified; qualification is per process and per factory, which is the slow part.Estimate, not a measurementPrototype at meaningful scale. Demonstrated on production-class tools and being qualified; qualification is per process and per factory, which is the slow part.By Substrata · 2026-09-15Supporting source →/9
Readiness is the 1–9 technology-readiness scale, a dated judgement; open a figure for the reasoning and its source.
12Ways to take part
Not investment advice. This says how the public can reach a company — a job, its shares, its products — not whether anyone should. It takes no account of anyone’s circumstances, and a company holding a chokepoint is not a reason to own it. What this is not
- Work there
- It publishes its roles on its own careers page.Official careers page ↗
- Own part of it
- No public listing was found for JSR (checked 2026-11-03); there may be no way for the public to own its shares.
- Buy from it
- What it does in the chain: Photoresists. At this depth of the chain most sales are to other businesses, under contract. Its own page describes what it offers.Its own page ↗
13Hiring
Its roles are published on its own site, which Substrata links rather than reads. Official careers page ↗
14Others at the same step of the chain
- ASMLEUV and DUV lithography systemsChokepoint
- Carl Zeiss SMTEUV projection opticsChokepoint
- TrumpfEUV plasma-source lasersChokepoint
- Applied MaterialsDeposition, etch and process toolsConcentrated
- Lam ResearchEtch and depositionConcentrated
- Tokyo ElectronCoaters, developers, etchConcentrated
- KLAProcess control and metrologyConcentrated
- ASM InternationalAtomic layer depositionConcentrated
- Tokyo Ohka KogyoPhotoresists and process chemicalsChokepoint
- Shin-Etsu ChemicalPhotoresists, masks and siliconesChokepoint
- NikonLithography systemsCompetitive
- CanonLithography and nanoimprintCompetitive
15Peers by share price
Reading peer prices…
16What we do not know yet
Reading what is missing…
17What this holds up
- Siliconone turn: Months
makes Photoresist formulation, which gates it.
Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15 · this join is sourced
A loop is one design, build and measure turn. Severity is a dated judgement on a 0–12 scale, not a measurement, and the judgements are not added together — the figure shown is the worst single one.
19Sources
- jsr.co.jp ↗ — its role in the chain: Photoresists; Photoresist formulation: makes it
Discussion
Comments use threadkit (permission is participation). Sign in with OrangeCat to write. Fact-check is the same assistant as Ask, grounded in the corpus.
Loading comments…