Fabrication · Taiwan
TSMC
01Share price
Reading closing prices…
02Key statistics
Reading the filings…
03Role in the chain
Leading-edge foundry. Holds 1 bottleneck outright; exposed to 5 of the 33 bottlenecks tracked here; a constraint on 8 organisations on record.
- 5 of 33Exposed toholds 1 · a constraint on 8 organisations
- 12 of 12Hardest bindingEUV lithography scanners · rests on it
- ChokepointDirectory gradea judgement, not a sourced fact
- 2330 TTListingTaiwan · TSM US
- 1Eventsnewest 2026-07-30 · 1 on what it holds
| Figure | Value | Note |
|---|---|---|
| Exposed to | 5 of 33 | holds 1 · a constraint on 8 organisations |
| Hardest binding | 12 of 12 | EUV lithography scanners · rests on it |
| Directory grade | Chokepoint | a judgement, not a sourced fact |
| Listing | 2330 TT | Taiwan · TSM US |
| Events | 1 | newest 2026-07-30 · 1 on what it holds |
Why graded so · A handful of fabs can run the newest node at volume, and one of them runs most of it.
Role cited from tsmc.com ↗. The grade is this project’s judgement. Report an error
Searching is free and needs no AI. Summaries use your own AI model.
04What constrains it
EUV lithography scanners · 12 of 12 · Binding now
Worked out: it holds Leading-edge foundry capacity, which needs this. Grade: worked out.
“EUV technology enables TSMC to keep driving chip scaling as the shorter wavelength of EUV light is better able to print the nanometer-scale features of advanced technology designs.”
pr.tsmc.com ↗ · read 2026-09-24
Held by 1 recorded maker: the only one on record.
- ASMLworked outHolds EUV lithography scanners; the company’s sentence does not name it. · from: ASML: Makes it (directory row on EUV lithography scanners)
- Carl Zeiss SMTworked outHolds EUV lithography scanners; the company’s sentence does not name it. (supplies a part) · from: Carl Zeiss SMT: Supplies a critical part (directory row on EUV lithography scanners)
- Trumpfworked outHolds EUV lithography scanners; the company’s sentence does not name it. (supplies a part) · from: Trumpf: Supplies a critical part (directory row on EUV lithography scanners)
No alternative is written down for it, which is not the same as none existing. Judged on how hard to replace: the worst on this test; on time to new capacity: the worst on this test (2026-09-15).
It rests on: EUV projection optics (12), High-purity tin, EUV droplet grade (10).
Photoresist formulation · 12 of 12 · Within two years
Worked out: it holds Leading-edge foundry capacity, which needs this. Grade: worked out.
“We continue to research and develop EUV resists with absorption wavelengths of 13.5nm, with a proven track record in mass production lines.”
tok-pr.com ↗ · read 2026-09-24 · A resist maker describing its own product in mass production; it does not name a fab.
Held by 3 recorded makers; the ones named by the source come first.
- JSRworked outHolds Photoresist formulation; the company’s sentence does not name it. · from: JSR: Makes it (directory row on Photoresist formulation)
- Shin-Etsu Chemicalworked outHolds Photoresist formulation; the company’s sentence does not name it. · from: Shin-Etsu Chemical: Makes it (directory row on Photoresist formulation)
- Tokyo Ohka Kogyoworked outHolds Photoresist formulation; the company’s sentence does not name it. · from: Tokyo Ohka Kogyo: Makes it (directory row on Photoresist formulation)
No alternative is written down for it, which is not the same as none existing. Judged on how hard to replace: the worst on this test; on time to new capacity: the worst on this test (2026-09-15).
300 mm prime silicon wafers · 11 of 12 · Within two years
Worked out: it holds Leading-edge foundry capacity, which needs this. Grade: worked out.
“300 mm Non-memory chip / MPU / CIS / Logic (Driver IC)”
sksiltron.com ↗ · read 2026-09-24 · A wafer maker’s product table: 300 mm wafers go to logic. It does not name a node.
Held by 5 recorded makers; the ones named by the source come first.
- GlobalWafersworked outHolds 300 mm prime silicon wafers; the company’s sentence does not name it. · from: GlobalWafers: Convert (directory row on 300 mm prime silicon wafers)
- Shin-Etsu Handotaiworked outHolds 300 mm prime silicon wafers; the company’s sentence does not name it. · from: Shin-Etsu Handotai: Convert (directory row on 300 mm prime silicon wafers)
- Siltronicworked outHolds 300 mm prime silicon wafers; the company’s sentence does not name it. · from: Siltronic: Convert (directory row on 300 mm prime silicon wafers)
- SK Siltronworked outHolds 300 mm prime silicon wafers; the company’s sentence does not name it. · from: SK Siltron: Convert (directory row on 300 mm prime silicon wafers)
All 5
- SUMCOworked outHolds 300 mm prime silicon wafers; the company’s sentence does not name it. · from: SUMCO: Convert (directory row on 300 mm prime silicon wafers)
No alternative is written down for it, which is not the same as none existing. Judged on how hard to replace: the worst on this test; on time to new capacity: serious (2026-09-15).
It rests on: Crucible-grade high-purity quartz sand (11), Electronic-grade polysilicon (10).
Liquid helium (He-4) · 10 of 12 · Within two years
Worked out: it holds Leading-edge foundry capacity, which needs this. Grade: worked out.
“Among the latest geopolitical uncertainties for the industry is a shortage of helium that could slow global production.”
dw.com ↗ · read 2026-09-24 · Chip production in general, not the leading edge only.
Held by 6 recorded makers; the ones named by the source come first.
- Air Liquideworked outHolds Liquid helium (He-4); the company’s sentence does not name it. · from: Air Liquide: Refine (directory row on Liquid helium (He-4))
- Air Productsworked outHolds Liquid helium (He-4); the company’s sentence does not name it. · from: Air Products: Refine (directory row on Liquid helium (He-4))
- ExxonMobilworked outHolds Liquid helium (He-4); the company’s sentence does not name it. · from: ExxonMobil: Mine / extract (directory row on Liquid helium (He-4))
- Gazpromworked outHolds Liquid helium (He-4); the company’s sentence does not name it. · from: Gazprom: Mine / extract (directory row on Liquid helium (He-4))
All 6
- Lindeworked outHolds Liquid helium (He-4); the company’s sentence does not name it. · from: Linde: Refine (directory row on Liquid helium (He-4))
- QatarEnergyworked outHolds Liquid helium (He-4); the company’s sentence does not name it. · from: QatarEnergy: Mine / extract (directory row on Liquid helium (He-4))
Alternatives written down: Any other coolant, below about 4 K (none known; blocked by physics); High-temperature superconducting magnets that run warmer (demonstrated, not qualified; blocked by qualification, capacity). Judged on how hard to replace: the worst on this test; on time to new capacity: serious (2026-09-15).
Neon, excimer laser grade · 10 of 12 · Within two years
Worked out: it holds Leading-edge foundry capacity, which needs this. Grade: worked out.
“Their highly pure inert neon gas is needed as a buffer for lasers used during the chip fabrication process.”
theregister.com ↗ · read 2026-09-24 · Chip fabrication in general, not the leading edge only.
Held by 6 recorded makers; the ones named by the source come first.
- Air Liquideworked outHolds Neon, excimer laser grade; the company’s sentence does not name it. · from: Air Liquide: Refine (directory row on Neon, excimer laser grade)
- Baosteel Gasesworked outHolds Neon, excimer laser grade; the company’s sentence does not name it. · from: Baosteel Gases: Refine (directory row on Neon, excimer laser grade)
- Cryoin Engineeringworked outHolds Neon, excimer laser grade; the company’s sentence does not name it. · from: Cryoin Engineering: Refine (directory row on Neon, excimer laser grade)
- Iceblickworked outHolds Neon, excimer laser grade; the company’s sentence does not name it. · from: Iceblick: Refine (directory row on Neon, excimer laser grade)
All 6
- Lindeworked outHolds Neon, excimer laser grade; the company’s sentence does not name it. · from: Linde: Refine (directory row on Neon, excimer laser grade)
- Messerworked outHolds Neon, excimer laser grade; the company’s sentence does not name it. · from: Messer: Refine (directory row on Neon, excimer laser grade)
No alternative is written down for it, which is not the same as none existing. Judged on how hard to replace: the worst on this test; on time to new capacity: serious (2026-09-15).
EUV lithography scanners: one maker is recorded and no alternative is written down, so how long a second source would take to qualify is not known.
Send evidence about its suppliers05What it constrains
Holds Leading-edge foundry capacity · 11 of 12
Organisations whose own sources say they need it:
- NVIDIAstatedNVIDIA names TSMC in the sentence that says it needs Leading-edge foundry capacity. · sec.gov ↗ · read 2026-09-24
- AMDstatedAMD names TSMC in the sentence that says it needs Leading-edge foundry capacity. · sec.gov ↗ · read 2026-09-24
- BroadcomstatedBroadcom names TSMC in the sentence that says it needs Leading-edge foundry capacity. · sec.gov ↗ · read 2026-09-24
- MicrosoftstatedMicrosoft names TSMC in the sentence that says it needs Leading-edge foundry capacity. · blogs.microsoft.com ↗ · read 2026-09-25
All 7
- Amazon Web Servicesworked outAmazon Web Services says it needs Leading-edge foundry capacity; TSMC is one of 3 recorded makers, and the sentence does not name it. · aboutamazon.com ↗ · read 2026-09-25
- CoreWeaveworked outCoreWeave says it needs Leading-edge foundry capacity; TSMC is one of 3 recorded makers, and the sentence does not name it. · sec.gov ↗ · read 2026-09-25
- Marvellworked outMarvell says it needs Leading-edge foundry capacity; TSMC is one of 3 recorded makers, and the sentence does not name it. · sec.gov ↗ · read 2026-09-25
Organisations whose market is its holders’ capacity:
- Applied Materialsworked outApplied Materials says its market is the holders of Leading-edge foundry capacity; TSMC is one. · sec.gov ↗ · read 2026-09-24
- Lam Researchworked outLam Research says its market is the holders of Leading-edge foundry capacity; TSMC is one. · sec.gov ↗ · read 2026-09-24
- KLAworked outKLA says its market is the holders of Leading-edge foundry capacity; TSMC is one. · sec.gov ↗ · read 2026-09-25
- Tokyo Electronworked outTokyo Electron says its market is the holders of Leading-edge foundry capacity; TSMC is one. · tel.com ↗ · read 2026-09-25
All 5
- ASM Internationalworked outASM International says its market is the holders of Leading-edge foundry capacity; TSMC is one. · asm.com ↗ · read 2026-09-25
Needed as an input by: Advanced packaging capacity (11).
Customers a source names
06Revenue and net income by year
Reading the filings…
07Chokepoints it holds
- Leading-edge foundry capacity
Runs the capacity · Binding now
Other makers: Samsung Foundry KR, Intel Foundry US IE IL
Score = concentration + substitution + lead time + inelasticity, each 0–3 · an analyst judgement dated 2026-09-15 · makers are those the corpus records, not the whole market
08Who owns it
Reading the ownership filings…
09How it does business
Customers — who buys from it · 4
Suppliers — who it buys from
No supplier of TSMC is recorded as a named company with a source yet.
Would be filled by: 10-K customers over 10% of revenue, 20-F related parties; offtake, royalty or supply agreement announced on an exchange feed; NI 43-101 or JORC report (mines); the counterparty’s own filing naming the company.
Send evidence about its suppliersCompetitors
No competitor of TSMC is recorded as a named company with a source yet.
Would be filled by: 10-K Item 1 “Competition”, or a 20-F “Competitive landscape” section; an agency or market report naming the producers of one product.
Send evidence about its competitors10Numbers it reports
Other · % · Leading-edge foundry capacity
| Period | TSMC 3nm share of wafer revenue (%) |
|---|---|
| Q3 2023 | 6 |
| Q4 2023 | 15 |
| Q1 2024 | 9 |
| Q2 2024 | 15 |
| Q3 2024 | 20 |
| Q4 2024 | 26 |
| Q1 2025 | 22 |
| Q2 2025 | 24 |
| Q3 2025 | 23 |
| Q4 2025 | 28 |
| Q1 2026 | 25 |
| Q2 2026 | 30 |
Capacity · wafers/month · Advanced packaging capacity
| Period | TSMC CoWoS monthly capacity (reported) (wafers/month) |
|---|---|
| 2024 | 35,000 |
| Dec 2025 | 75,000 |
Other · % · Leading-edge foundry capacity
| Period | TSMC 5nm share of wafer revenue (%) |
|---|---|
| Q4 2021 | 23 |
| Q1 2022 | 20 |
| Q2 2022 | 21 |
| Q3 2022 | 28 |
| Q4 2022 | 32 |
| Q1 2023 | 31 |
| Q2 2023 | 30 |
| Q3 2023 | 37 |
| Q4 2023 | 35 |
| Q1 2024 | 37 |
| Q2 2024 | 35 |
| Q3 2024 | 32 |
| Q4 2024 | 34 |
| Q1 2025 | 36 |
| Q2 2025 | 36 |
| Q3 2025 | 37 |
| Q4 2025 | 35 |
| Q1 2026 | 36 |
| Q2 2026 | 33 |
- TSMC 7nm share of wafer revenueOther · 19 pointsSource: TSMC 2Q26 earnings release (SEC Form 6-K exhibit) (Q2 2026)SourcedTSMC 2Q26 earnings release (SEC Form 6-K exhibit) · Q2 2026Open the source → % · Q2 2026
- TSMC capital expenditures (NT$)Capacity · 6 pointsSource: TSMC Form 20-F FY2025 (2025)SourcedTSMC Form 20-F FY2025 · 2025Open the source → TWD bn · 2025
- TSMC full-time employees (year-end)Workforce · 6 pointsSource: TSMC Form 20-F FY2025 (31 Dec 2025)SourcedTSMC Form 20-F FY2025 · 31 Dec 2025Open the source → people · 31 Dec 2025
- TSMC capital budget guidanceCapacity · 5 pointsSource: TSMC 4Q25 earnings release (SEC Form 6-K exhibit) (2026)SourcedTSMC 4Q25 earnings release (SEC Form 6-K exhibit) · 2026Open the source → USD bn · 2026
- TSMC capital expendituresCapacity · 3 pointsSource: TSMC 4Q25 earnings call transcript (Q4 2025)SourcedTSMC 4Q25 earnings call transcript · Q4 2025Open the source → USD bn · Q4 2025
- TSMC CoWoS monthly capacity (projection)Capacity · 3 pointsSource: TrendForce News (citing Taiwanese press / institutional investors) (Dec 2025)SourcedTrendForce News (citing Taiwanese press / institutional investors) · Dec 2025Open the source → wafers/month · Dec 2025
- TSMC advanced packaging share of revenueOther · 2 pointsSource: TSMC 4Q25 earnings call transcript (2025)SourcedTSMC 4Q25 earnings call transcript · 2025Open the source → % · 2025
- TSMC 2nm share of wafer revenueOther · 1 pointsSource: TSMC 2Q26 earnings release (SEC Form 6-K exhibit) (Q2 2026)SourcedTSMC 2Q26 earnings release (SEC Form 6-K exhibit) · Q2 2026Open the source → % · Q2 2026
- TSMC capex share for advanced packaging, masks and othersCapacity · 1 pointsSource: TSMC 4Q25 earnings call transcript (2026)SourcedTSMC 4Q25 earnings call transcript · 2026Open the source → % · 2026
- TSMC planned CoWoS capacity expansion by 2027Capacity · 1 pointsSource: TrendForce press release (2027)SourcedTrendForce press release · 2027Open the source → % · 2027
- TSMC professionals (engineers etc.) headcount (year-end)Workforce · 1 pointsSource: TSMC Form 20-F FY2025 (31 Dec 2025)SourcedTSMC Form 20-F FY2025 · 31 Dec 2025Open the source → people · 31 Dec 2025
Read from the company’s own reports and calls by hand and committed with the sentence each number came from; nothing is interpolated. Every series
11What has happened
| Date | Event | Effect |
|---|---|---|
| 10 Nov 2022 | TSMC moves to build a neon supply chain in Taiwan after the war in Ukraine cut global supply. | down |
| 30 Jul 2026 | Samsung brings its first Taylor, Texas fab online and will start a second by year end, warning the shortage runs to 2028. | down |
| 15 Oct 2026 | SEC 6-K: TSMC — Foreign issuer report | neutral |
| 22 Oct 2026 | SEC 6-K: TSMC — Foreign issuer report | neutral |
| 10 Nov 2026 | SEC 6-K: TSMC — Foreign issuer report | neutral |
| 10 Nov 2026 | SEC 6-K: TSMC — Foreign issuer report | neutral |
| 12 Nov 2026 | SEC 6-K: TSMC — Foreign issuer report | neutral |
| 13 Nov 2026 | SEC 6-K: TSMC — Foreign issuer report | neutral |
| 25 Nov 2026 | SEC 6-K: TSMC — Foreign issuer report | neutral |
| 25 Nov 2026 | SEC 6-K: TSMC — Foreign issuer report | neutral |
Names TSMC
- 2022-11-10LoosensCapacityTW
TSMC moves to build a neon supply chain in Taiwan after the war in Ukraine cut global supply.
WhoTSMC
tomshardware.com ↗official source
The sentence that says so
“TSMC to Build Neon Supply Chain After Russia Decimated Global Supply.”
About what it holds, not naming TSMC
Samsung brings its first Taylor, Texas fab online and will start a second by year end, warning the shortage runs to 2028. koreaherald.com ↗
Filed with the SEC
- 25 NovSEC 6-K
Foreign issuer report sec.gov ↗
- 25 NovSEC 6-K
Foreign issuer report sec.gov ↗
- 13 NovSEC 6-K
Foreign issuer report sec.gov ↗
- 12 NovSEC 6-K
Foreign issuer report sec.gov ↗
- 10 NovSEC 6-K
Foreign issuer report sec.gov ↗
- 10 NovSEC 6-K
Foreign issuer report sec.gov ↗
- 22 OctSEC 6-K
Foreign issuer report sec.gov ↗
- 15 OctSEC 6-K
Foreign issuer report sec.gov ↗
The company’s own filings, from SEC EDGAR, fetched hourly. Substrata has not judged their effect on any bottleneck.
12Unread leads
Semiconductors: what are the biggest unsolved problems? newmarketpitch.com ↗
Applied Materials (AMAT) SEMICON West 2026 Summary quartr.com ↗
Title: The PC Downturn Is an AI Supply Story thediligencestack.com ↗
All 4 leads
Pages the sweep found on these chokepoints. Nobody here has read them yet; they are not events and not evidence.
13What could loosen its grip
- High-numerical-aperture EUVreadiness
The next generation of the machine that prints chip patterns, with larger optics that resolve finer features in one pass.
Science · for Leading-edge foundry capacity
Estimate by Substrata, 2026-09-15: Qualified and entering production. Past development: ASML says Intel Foundry entered high-volume manufacturing on High-NA-patterned layers in 2026, at yields matching the previous generation. This row said "not yet volume production" until the source was read.Estimate, not a measurementQualified and entering production. Past development: ASML says Intel Foundry entered high-volume manufacturing on High-NA-patterned layers in 2026, at yields matching the previous generation. This row said "not yet volume production" until the source was read.By Substrata · 2026-09-15Supporting source →/9
Readiness is the 1–9 technology-readiness scale, a dated judgement; open a figure for the reasoning and its source.
14Ways to take part
Not investment advice. This says how the public can reach a company — a job, its shares, its products — not whether anyone should. It takes no account of anyone’s circumstances, and a company holding a chokepoint is not a reason to own it. What this is not
- Work there
- It publishes its roles on its own careers page.Official careers page ↗
- Own part of it
- Its shares trade publicly as 2330 TT and TSM US, bought and sold through a broker that reaches that exchange.2330 TT listing record ↗TSM US listing record ↗Its SEC filings
- Buy from it
- What it does in the chain: Leading-edge foundry. At this depth of the chain most sales are to other businesses, under contract. Its own page describes what it offers.Its own page ↗
15Hiring
Its roles are published on its own site, which Substrata links rather than reads. Official careers page ↗
16Others at the same step of the chain
- Samsung FoundryLeading-edge foundry and memoryConcentrated
- Intel FoundryLeading-edge foundryConcentrated
- SMICFoundryConcentrated
- GlobalFoundriesMature and specialty nodesCompetitive
- UMCMature-node foundryCompetitive
17Peers by share price
Reading peer prices…
18What we do not know yet
Nothing this page shows is missing for lack of a source we know. Each figure above names its own filing and date.
19What this holds up
- Software scaffoldone turn: Minutes
makes Leading-edge foundry capacity, which gates it.
Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15 · this join is sourced
- Firmware and programmable logicone turn: Minutes to hours
makes Leading-edge foundry capacity, which gates it.
Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15 · this join is sourced
- Frontier training runone turn: Weeks to months
makes Leading-edge foundry capacity, which gates it.
Worst judgement on this loop: How this is computedThe highest severity score among the bottlenecks recorded as gates on the loop.Method →Code →, judged 2026-09-15 · this join is sourced
A loop is one design, build and measure turn. Severity is a dated judgement on a 0–12 scale, not a measurement, and the judgements are not added together — the figure shown is the worst single one.
21Sources
- tsmc.com ↗ — its role in the chain: Leading-edge foundry; Leading-edge foundry capacity: runs the capacity
- tomshardware.com ↗ — event, 2022-11-10: TSMC moves to build a neon supply chain in Taiwan after the war in Ukraine cut global supply.
Discussion
Comments use threadkit (permission is participation). Sign in with OrangeCat to write. Fact-check is the same assistant as Ask, grounded in the corpus.
Loading comments…